Washoe Project-Rate Order No. WAPA-160
The Western Area Power Administration (Western) extends, on an interim basis, the existing Washoe Project formula rate through September 30, 2017. The existing Non-Firm Power Formula Rate Schedule SNF-7 expires on July 31, 2013. The formula rate will be in effect until the Federal Energy Regulatory Commission (FERC) places the formula rate into effect on a final basis or until it is replaced by another rate.
Pacific Northwest-Pacific Southwest Intertie Project-Rate Order No. WAPA-157
The Deputy Secretary of Energy confirmed and approved Rate Order No. WAPA-157 and Rate Schedules INT-FT5 and INT-NFT4, placing firm and nonfirm transmission service rates for the Pacific Northwest- Pacific Southwest Intertie Project (Intertie) of the Western Area Power Administration (Western) into effect on an interim basis. The provisional rates will be in effect until the Federal Energy Regulatory Commission (FERC) confirms, approves, and places them into effect on a final basis, or until they are replaced by other rates. The provisional rates will provide sufficient revenue to pay all annual costs, including interest expense, and repay required investment within the allowable periods.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.