Western Area Power Administration July 2011 – Federal Register Recent Federal Regulation Documents
Results 1 - 3 of 3
Post-2014 Resource Pool; Loveland Area Projects, Proposed Power Allocation
Western Area Power Administration (Western), a Federal power marketing agency within the Department of Energy, has announced its Post-2014-Loveland Area Projects (LAP) Resource Pool Proposed Power Allocation developed under the requirements of the Power Marketing Initiative of Western's Energy Planning and Management Program (Program). Western notified the public of allocation procedures and called for applications on December 17, 2010. Applications were accepted at Western's Rocky Mountain Customer Service Region until 4 p.m. MST, March 4, 2011. Review of the applications received resulted in this Notice of Proposed Power Allocation.
Notice of Intent To Prepare an Environmental Impact Statement and to Conduct Scoping Meetings; Proposed Wilton IV Wind Energy Center Project, North Dakota
NextEra Energy Resources (NextEra) applied to interconnect its proposed 99-megawatt (MW) Wilton IV Wind Energy Center Project (Project) with Western Area Power Administration's (Western) existing Hilken Switching Station in Burleigh County, North Dakota. The proposed Project would consist of up to 62 1.6-MW wind turbine generators and associated infrastructure located across approximately 15,725 acres of land in Burleigh County, about 20 miles north of Bismarck. In addition to constructing and operating the above proposed Project, NextEra has requested to operate its nearby existing Wilton I (also known as Burleigh), Wilton II, and Baldwin Wind Energy Center projects at levels exceeding 50 average annual MW, when wind conditions warrant. Western will prepare an environmental impact statement (EIS) on NextEra's proposal to interconnect their Project and to operate its existing projects above 50 average annual MW in accordance with the National Environmental Protection Act (NEPA), U.S. Department of Energy (DOE) NEPA Implementing Procedures, and the Council on Environmental Quality (CEQ) regulations for implementing NEPA. Portions of NextEra's proposed Project may affect floodplains and wetlands, so this Notice of Intent (NOI) also serves as a notice of proposed floodplain or wetland action in accordance with DOE floodplain and wetland environmental review requirements.
Notice of Cancellation of Environmental Impact Statement for the Proposed Crowned Ridge Wind Energy Center Project, Codington and Grant Counties, SD
The U.S. Department of Energy (DOE), Western Area Power Administration (Western) is issuing this notice to advise the public that it is cancelling the preparation of an environmental impact statement (EIS) under the National Environmental Policy Act (NEPA) on an interconnection request by NextEra Energy Resources (NextEra).
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.