Western Area Power Administration June 2006 – Federal Register Recent Federal Regulation Documents
Results 1 - 2 of 2
Desert Southwest Customer Service Region-Rate Order No. WAPA-127
The Deputy Secretary of Energy confirmed and approved Rate Order No. WAPA-127 and Rate Schedules PD-NTS2 and INT-NTS2, placing rates for Network Integration Transmission Service (Network Service) for the Parker-Davis Project (PDP) and the Pacific Northwest-Pacific Southwest Intertie Project (Intertie) of the Western Area Power Administration (Western) into effect on an interim basis. The Deputy Secretary of Energy also confirmed Rate Schedules DSW-SD2, DSW-RS2, DSW-FR2, DSW-EI2, DSW-SPR2, and DSW-SUR2, placing ancillary services rates from the PDP, Boulder Canyon Project (BCP), Central Arizona Project (CAP), and that part of the Colorado River Storage Project (CRSP) located in the Western Area Lower Colorado (WALC) Balancing Authority and Transmission Operations Area (BATO) into effect on an interim basis. The provisional rates will be in effect until the Federal Energy Regulatory Commission (Commission) confirms, approves, and places them into effect on a final basis or until they are replaced by other rates. The provisional rates will provide sufficient revenue to pay all annual costs, including interest expense, and repay power investment and irrigation aid, within the allowable periods.
Construction and Operation of the Trinity Public Utility District Direct Interconnection Project, Trinity County, CA
The Western Area Power Administration (Western), Department of Energy (DOE), intends to prepare an environmental impact statement (EIS) to construct and operate proposed power transmission facilities in Trinity County, California. The U.S. Forest Service (USFS) and the Bureau of Land Management (BLM) will participate in the preparation of the EIS, which will address the proposed removal of about 5.3 miles of 12-kilovolt (kV) distribution line, and the construction and operation of about 16 miles of new 60-kV transmission line, a tap structure and associated equipment, and a new switchyard. Input for the scope of the EIS may be provided in writing or at a scoping meeting in the project area.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.