Western Area Power Administration June 26, 2006 – Federal Register Recent Federal Regulation Documents
Results 1 - 1 of 1
Desert Southwest Customer Service Region-Rate Order No. WAPA-127
The Deputy Secretary of Energy confirmed and approved Rate Order No. WAPA-127 and Rate Schedules PD-NTS2 and INT-NTS2, placing rates for Network Integration Transmission Service (Network Service) for the Parker-Davis Project (PDP) and the Pacific Northwest-Pacific Southwest Intertie Project (Intertie) of the Western Area Power Administration (Western) into effect on an interim basis. The Deputy Secretary of Energy also confirmed Rate Schedules DSW-SD2, DSW-RS2, DSW-FR2, DSW-EI2, DSW-SPR2, and DSW-SUR2, placing ancillary services rates from the PDP, Boulder Canyon Project (BCP), Central Arizona Project (CAP), and that part of the Colorado River Storage Project (CRSP) located in the Western Area Lower Colorado (WALC) Balancing Authority and Transmission Operations Area (BATO) into effect on an interim basis. The provisional rates will be in effect until the Federal Energy Regulatory Commission (Commission) confirms, approves, and places them into effect on a final basis or until they are replaced by other rates. The provisional rates will provide sufficient revenue to pay all annual costs, including interest expense, and repay power investment and irrigation aid, within the allowable periods.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.