Pick-Sloan Missouri Basin Program-Eastern Division-Rate Order No. WAPA-126
Document Number: E5-6576
Type: Notice
Date: 2005-11-28
Agency: Department of Energy, Western Area Power Administration
The Deputy Secretary of Energy confirmed and approved Rate Order No. WAPA-126 and Rate Schedules P-SED-F8 and P-SED-FP8, placing firm power and firm peaking power rates from the Pick-Sloan Missouri Basin ProgramEastern Division (P-SMBPED) of the Western Area Power Administration (Western) into effect on an interim basis. The provisional rates will be in effect until the Federal Energy Regulatory Commission (Commission) confirms, approves, and places them into effect on a final basis or until they are replaced by other rates. The provisional rates will provide sufficient revenue to pay all annual costs, including interest expense, and repay power investment and irrigation aid, within the allowable periods.
Loveland Area Projects
Document Number: E5-6575
Type: Notice
Date: 2005-11-28
Agency: Department of Energy, Western Area Power Administration
The Deputy Secretary of Energy confirmed and approved Rate Order No. WAPA-125 and Rate Schedule L-F6, placing firm electric service rates from the Loveland Area Projects (LAP) of the Western Area Power Administration (Western) into effect on an interim basis. The provisional rates will be in effect until the Federal Energy Regulatory Commission (Commission) confirms, approves, and places them into effect on a final basis or until they are replaced by other rates. The provisional rates will provide sufficient revenue to pay all annual costs, including interest expenses, and repay power investment and irrigation aid, within the allowable periods.
Parker-Davis Project, Pacific Northwest-Pacific Southwest Intertie Project, and the Central Arizona Project-Rate Order No. WAPA-114
Document Number: E5-6572
Type: Notice
Date: 2005-11-28
Agency: Department of Energy, Western Area Power Administration
The Western Area Power Administration (Western) initiated a formal rate process for the purpose of implementing a multi-system transmission rate (MSTR) by a Federal Register notice published on June 22, 2004. The process was extended by a Federal Register notice on March 3, 2005. The purpose of the extension was to allow Western time to respond to customer requests to develop a customer choice model. Western developed and presented a customer choice methodology in public information and public comment forums held March 29, 2005, and April 6, 2005, respectively. Effective November 28, 2005, Western is withdrawing the MSTR proposal for long-term firm transmission service on the Parker-Davis Project (P-DP), the Pacific Northwest-Pacific Southwest Intertie Project (Intertie), and the Central Arizona Project (CAP). Western has considered all comments in its decision to withdraw its proposal for the MSTR for long-term firm transmission service. Western is, however, studying the conversion of non-firm and short-term firm transmission service on the Parker-Davis, Intertie and Central Arizona projects to a multi-system service. Customer notification will be provided and feedback sought in a separate informal process.
Solicitation of Interest for New Transmission Capacity Between Wyoming and Colorado
Document Number: 05-22628
Type: Notice
Date: 2005-11-15
Agency: Department of Energy, Western Area Power Administration
The electricity corridor between southeastern Wyoming and northeastern Colorado has experienced a transmission constraint for a number of years. This constraint is designated in the Western Electricity Coordinating Council's Path Rating Catalog and referenced in this notice as ``TOT 3.'' To examine possibilities for relieving the TOT 3 constraint, the Western Area Power Administration (Western) has entered into a Memorandum of Understanding (MOU) with the Wyoming Infrastructure Authority (WIA) and Trans-Elect, Inc. (Trans-Elect). Under this MOU, Western is soliciting expressions of interest from entities desiring transmission rights on a new line potentially to be built across TOT 3.