Integrated System, Sam Rayburn Dam and Robert D. Willis Rate Schedules
The Administrator, Southwestern Power Administration (Southwestern), is proposing a two-year extension to the currently approved rate schedules for the Integrated System, the Sam Rayburn Dam, and the Robert Douglas Willis Hydropower Project (Robert D. Willis) for the period October 1, 2019 to September 30, 2021. Southwestern's current Integrated System rate schedules (P-13A, NFTS-13A, and EE-13), Sam Rayburn Dam rate schedule (SRD-15), and Robert D. Willis rate schedule (RDW-15) are set to expire September 30, 2019.
Integrated System Rate Schedule
The Assistant Secretary has approved and placed into effect on an interim basis Rate Order No. SWPA-73, which provides the following Integrated System Wholesale Rates for Hydro Peaking Power (P-13A) Rate Schedule: Rate Schedule P-13A, Wholesale Rates for Hydro Peaking Power.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.