Southwestern Power Administration 2010 – Federal Register Recent Federal Regulation Documents
Results 1 - 3 of 3
White River Minimum Flows-Addendum to Final Determination of Federal and Non-Federal Hydropower Impacts
Southwestern Power Administration (Southwestern) has finalized an addendum to its January 2009 Final Determination Report concerning the Federal and non-Federal hydropower impacts of the White River Minimum Flows project. The addendum documents changes to Southwestern's final determination. The changes were made to account for the impacts that the increase in average pool elevation has on the operation of the Federal Bull Shoals and Norfork projects and to include impacts to non-Federal hydropower resulting from the loss of renewable energy under the state renewable energy standard in Missouri.
Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005
The Department of Energy (DOE or Department), acting through the Southwestern Power Administration (Southwestern) and the Western Area Power Administration (Western), both power marketing administrations (PMAs) within the Department, is seeking Project Proposals from entities that are interested in providing contributed funds under section 1222 of the Energy Policy Act of 2005 (EPAct) for Southwestern or Western's participation in the upgrade of existing transmission facilities owned by either PMA, or the construction of new transmission lines in the states in which either PMA operates.
Integrated System Power Rates
Pursuant to Delegation Order Nos. 00-037.00, effective December 6, 2001, and 00-001.00C, effective January 31, 2007, the Deputy Secretary has approved and placed into effect on an interim basis Rate Order No. SWPA-62, which increases the power rates for the Integrated System pursuant to the following Integrated System Rate Schedules:
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.