Southwestern Power Administration February 14, 2006 – Federal Register Recent Federal Regulation Documents
Results 1 - 1 of 1
Integrated System Power Rates
Pursuant to Delegation Order Nos. 00-037.00, effective December 6, 2001, and 00-001-00B, effective July 28, 2005, the Deputy Secretary has approved and placed into effect on an interim basis Rate Order No. SWPA-53, which increases the power rates for the Integrated System pursuant to the following Integrated System Rate Schedules: Rate Schedule P-05, Wholesale Rates for Hydro Peaking Power. Rate Schedule NFTS-05, Wholesale Rates for Non-Federal Transmission/Interconnection Facilities Service. Rate Schedule EE-05, Wholesale Rate for Excess Energy. The rate schedules supersede the existing rate schedules shown below: Rate Schedule P-04, Wholesale Rates for Hydro Peaking Power (superseded by P-05). Rate Schedule NFTS-04, Wholesale Rates for Non-Federal Transmission/Interconnection Facilities Service (superseded by NFTS- 05). Rate Schedule EE-04, Wholesale Rate for Excess Energy (superseded by EE-05).
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.