Southwestern Power Administration 2006 – Federal Register Recent Federal Regulation Documents
Results 1 - 7 of 7
Robert D. Willis Hydropower Rate Schedules
Pursuant to Delegation Order Nos. 00-037.00, effective December 6, 2001, and 00-001.00B, effective July 28, 2005, the Deputy Secretary has approved and placed into effect on an interim basis Rate Order No. SWPA-57, which increases the power rate for the Robert Douglas Willis Hydropower Project (Willis) pursuant to the following Willis Rate Schedule:
Integrated System Power Rates
Pursuant to Delegation Order Nos. 00-037.00, effective December 6, 2001, and 00-001-00B, effective July 28, 2005, the Deputy Secretary has approved and placed into effect on an interim basis Rate Order No. SWPA-56, which increases the power rates for the Integrated System pursuant to the following Integrated System Rate Schedules:
Robert D. Willis Power Rate
The Administrator, Southwestern Power Administration (Southwestern), has prepared Current and Revised 2006 Power Repayment Studies (PRS) that show the need for an increase in annual revenues to meet cost recovery criteria. Such increased revenues are required primarily due to significant increases in U.S. Army Corps of Engineers' generation investment at the project. The Administrator has developed a proposed Robert D. Willis rate schedule, which is supported by a PRS, to recover the required revenues. Beginning January 1, 2007, the proposed rates would increase annual revenues approximately 25.8 percent from $648,096 to $815,580.
Integrated System Power Rates
The Administrator, Southwestern Power Administration (Southwestern), has prepared Current and Revised 2006 Power Repayment Studies which show the need for an increase in annual revenues to meet cost recovery criteria. Such increased revenues are needed primarily to cover increased investments and replacements in hydroelectric generating facilities and increased purchased power expenses. The Administrator has developed proposed Integrated System rates, which are supported by a rate design study, to recover the required revenues. The May 2006 Revised Study indicates that the proposed rates would increase annual system revenues approximately 25.9 percent from $136,267,400 to $171,505,848, over a three-year period to meet projected annual expenses and repay the investments in facilities over the required number of years.
Integrated System Power Rates
Pursuant to Delegation Order Nos. 00-037.00, effective December 6, 2001, and 00-001-00B, effective July 28, 2005, the Deputy Secretary has approved and placed into effect on an interim basis Rate Order No. SWPA-53, which increases the power rates for the Integrated System pursuant to the following Integrated System Rate Schedules: Rate Schedule P-05, Wholesale Rates for Hydro Peaking Power. Rate Schedule NFTS-05, Wholesale Rates for Non-Federal Transmission/Interconnection Facilities Service. Rate Schedule EE-05, Wholesale Rate for Excess Energy. The rate schedules supersede the existing rate schedules shown below: Rate Schedule P-04, Wholesale Rates for Hydro Peaking Power (superseded by P-05). Rate Schedule NFTS-04, Wholesale Rates for Non-Federal Transmission/Interconnection Facilities Service (superseded by NFTS- 05). Rate Schedule EE-04, Wholesale Rate for Excess Energy (superseded by EE-05).
Robert D. Willis Hydropower Rate Schedules
Pursuant to Delegation Order Nos. 00-037.00, effective December 6, 2001, and 00-001.00B, effective July 28, 2005, the Deputy Secretary has approved and placed into effect on an interim basis Rate Order No. SWPA-55, which increases the power rate for the Robert Douglas Willis Hydropower Project (Willis) pursuant to the following Willis Rate Schedule:
Sam Rayburn Dam Power Rate Schedule
Pursuant to Delegation Order Nos. 00-037.00, effective December 6, 2001, and 00-001.00B, effective July 28, 2005, the Deputy Secretary has approved and placed into effect on an interim basis Rate Order No. SWPA-54, which increases the power rate for the Sam Rayburn Dam Project (Rayburn) pursuant to the following Sam Rayburn Dam Rate Schedule:
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.