Notice of Interim Approval of Rate Schedules for the Georgia-Alabama-South Carolina Projects
The Administrator for the Southeastern Power Administration (Southeastern) has confirmed and approved, on an interim basis, rate schedules SOCO-1-G, SOCO-2-G, SOCO-3-G, SOCO-4-G, Duke-1-G, Duke-2-G, Duke-3-G, Duke-4-G, Santee-1-G, Santee-2-G, Santee-3-G, Santee-4-G, SCE&G-1-G, SCE&G-2-G, SCE&G-3-G, SCE&G-4-G, Pump-1-A, and Replacement- 1. These rate schedules are applicable to Southeastern power sold to existing preference customers in Alabama, Florida, Georgia, Mississippi, North Carolina, and South Carolina. The rate schedules are approved on an interim basis through September 30, 2027, and are subject to confirmation and approval by the Federal Energy Regulatory Commission (FERC) on a final basis.