Southeastern Power Administration 2012 – Federal Register Recent Federal Regulation Documents
Results 1 - 3 of 3
Georgia-Alabama-South Carolina System
The Deputy Secretary, Department of Energy, confirmed and approved, on an interim basis new rate schedules SOCO-1-E, SOCO-2-E, SOCO-3-E, SOCO-4-E, ALA-1-N, MISS-1-N, Duke-1-E, Duke-2-E, Duke-3-E, Duke-4-E, Santee-1-E, Santee-2-E, Santee-3-E, Santee-4-E, SCE-G-1-E, SCE-G-2-E, SCE&G-3-E, SCE&G-4-E, Pump-1-A, Pump-2, Replacement-1, and Regulation-1. These rate schedules are applicable to Southeastern power sold to existing preference customers in Mississippi, Alabama, Florida, Georgia, North Carolina, and South Carolina. The rate schedules are approved on an interim basis through September 30, 2017, and are subject to confirmation and approval by the Federal Energy Regulatory Commission (FERC) on a final basis.
Georgia-Alabama-South Carolina System of Projects
The period for submitting written comments on Southeastern's proposed rate adjustment is extended to June 19, 2012.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.