Department of Energy March 16, 2018 – Federal Register Recent Federal Regulation Documents
Results 1 - 5 of 5
American LNG Marketing, LLC
The Office of Fossil Energy (FE) of the Department of Energy (DOE) gives notice of receipt of a Notice of Change in Control (Notice) filed January 9, 2018, by American LNG Marketing, LLC (ALM) in the above-referenced dockets. The Notice describes a change in control of Fortress Investment Group LLC (Fortress), the ultimate parent company of ALM. The Notice was filed under section 3 of the Natural Gas Act (NGA).
Notice of Decision and Order Granting a Waiver to New Shunxiang Electrical Appliance Co., Ltd., From the Department of Energy Refrigerator, Refrigerator-Freezer, Freezer Test Procedure
This notice announces a Decision and Order granting to New Shunxiang Electrical Appliance Co., Ltd., (``New Shunxiang'') a waiver from specified portions of the DOE test procedure for determining the energy consumption of specified refrigerator and refrigerator-freezer basic models. New Shunxiang is required to test and rate the specified basic model of its combination cooler refrigeration product in accordance with the alternate test procedure described in the Decision and Order.
Notice of Decision and Order Granting a Waiver to Acuity Brands Lighting, Inc. From the Department of Energy Illuminated Exit Signs Test Procedure
The U.S. Department of Energy (``DOE'') announces a Decision and Order granting Acuity Brands Lighting, Inc. (Acuity) a waiver from specified portions of the DOE test procedure for determining the energy consumption of specified combination illuminated exit signs basic models. Acuity is required to test and rate the specified basic models of its combination illuminated exit signs in accordance with the alternate test procedure described in the Decision and Order.
Notice of Decision and Order Granting Individual Waivers to Apple Inc., Microsoft Corporation, Poin2 Lab and Hefei Bitland Information Technology Co., From the Department of Energy External Power Supplies Test Procedure
This notice announces a Decision and Order granting Apple, Inc. (``Apple''), Microsoft Corporation (``Microsoft''), Poin2 Lab (``Poin2'') and Hefei Bitland Information Technology Co. Ltd. (``Bitland'') individual waivers from specified portions of the DOE test procedure for determining the energy efficiency of external power supplies. The petitioners are required to test and rate specifically identified external power supply basic models in accordance with the alternate test procedure described in the Decision and Order.
International Energy Agency Meetings
The Industry Advisory Board (IAB) to the International Energy Agency (IEA) will meet on March 20, 2018, at OECD Conference Centre, Room CC 7, 2 Rue Andr[eacute] Pascal, 75016 Paris, France, in connection with a joint meeting of the IEA's Standing Group on Emergency Questions (SEQ) and the IEA's Standing Group on the Oil Market (SOM) on March 21, 2018, in connection with a meeting of the SEQ on that day.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.