Department of Energy July 6, 2017 – Federal Register Recent Federal Regulation Documents

Notice of Availability for Public Comment of Interconnection Facilities Studies Summary Prepared for the Proposed Northern Pass Transmission Project
Document Number: 2017-14165
Type: Notice
Date: 2017-07-06
Agency: Department of Energy
Northern Pass Transmission LLC (NPT) applied to the U.S. Department of Energy (DOE) for a Presidential permit to construct, operate, maintain, and connect an electric transmission line across the U.S. border with Canada, currently referred to as the Northern Pass Project. NPT would construct and operate an overhead high-voltage direct current (HVDC) electric transmission line that is to originate at an HVDC converter station near Sherbrooke, Qu[eacute]bec, Canada; connect to a facility in Franklin, New Hampshire, that will convert the line's direct current to alternating current (AC); and continue from there to its southern terminus in Deerfield, New Hampshire. The proposed facilities will be capable of transmitting up to 1,090 megawatts (MW) of power. The amended applications are summarized below. DOE hereby announces the availability for public comment of a summary of the interconnection facilities studies prepared for the NPT project.
Combined Notice of Filings #2
Document Number: 2017-14149
Type: Notice
Date: 2017-07-06
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings #1
Document Number: 2017-14148
Type: Notice
Date: 2017-07-06
Agency: Department of Energy, Federal Energy Regulatory Commission
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.