Venture Global LNG, LLC; Application for Long-Term Authorization to Export Liquefied Natural Gas Produced from Domestic Natural Gas Resources to Non-Free Trade Agreement Countries for a 25-Year Period
Document Number: 2014-12210
Type: Notice
Date: 2014-05-27
Agency: Department of Energy
The Office of Fossil Energy (FE) of the Department of Energy (DOE) gives notice of receipt of an application (Application), filed on May 13, 2013, by Venture Global LNG, LLC (Venture Global), requesting long-term, multi-contract authorization to export domestically produced liquefied natural gas (LNG) \1\ in a volume up to 5 million metric tons per year (mtpa), which is equivalent to approximately 243.6 billion cubic feet per year (Bcf/yr) of natural gas, or 0.67 Bcf per day (Bcf/ d).\2\ Venture Global seeks authorization to export the LNG by vessel \3\ from the proposed Venture Global LNG Project (Project), a natural gas liquefaction and LNG export terminal to be located along the Calcasieu Ship Channel in Cameron Parish, Louisiana. Venture Global requests authorization to export this LNG for a 25-year term commencing on the earlier of the date of first export or eight years from the date the authorization is granted.
Combined Notice of Filings #1
Document Number: 2014-12187
Type: Notice
Date: 2014-05-27
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings #1
Document Number: 2014-12186
Type: Notice
Date: 2014-05-27
Agency: Department of Energy, Federal Energy Regulatory Commission
Crystal Springs Hatchery Program
Document Number: 2014-11994
Type: Notice
Date: 2014-05-27
Agency: Bonneville Power Administration, Department of Energy
In accordance with the National Environmental Policy Act (NEPA), BPA intends to prepare an EIS on its decision whether to fund the Shoshone-Bannock Tribes of the Fort Hall Reservation of Idaho (Tribes) proposal to construct and operate a hatchery for spring/summer Chinook salmon in the Salmon River subbasin and Yellowstone cutthroat trout in the Upper Snake River subbasin on Fort Hall Reservation. The Tribes' proposed project that BPA is considering funding would involve construction of a hatchery and construction of two fish trapping (weir) facilities on US Forest Service (USFS) land. The hatchery would be constructed at the site of an obsolete trout hatchery owned by BPA on Crystal Springs in Bingham County, Idaho. The weirs would involve construction of a weir in the Yankee Fork of the Salmon River at the USFS Pole Flat Campground in Custer County, relocation of a section of Yankee Fork Road and associated facilities (RV pads), and construction of a weir on USFS land in Panther Creek in Lemhi County, Idaho. The USFS will be a cooperating agency on this EIS to inform their decision on whether to grant a special use permit for construction and operation of the two weirs and associated facilities and relocation of the road on forest service lands. Operations of the hatchery would include collection of adult spring/summer Chinook for broodstock from existing hatcheries, incubation and rearing of juvenile Chinook, and release of smolts into the Yankee Fork and Panther Creek. Over time, broodstock would be collected at the Yankee Fork and Panther Creek weirs. Chinook were extirpated from Panther Creek in the mid-1900s. In 1992, Chinook salmon native to Yankee Fork were listed as threatened under the Endangered Species Act (ESA); currently the population is classified at high risk of extinction and has been identified as an independent population of Snake River spring/ summer Chinook salmon. The proposal would augment anadromous fish populations available for harvest and aid in establishing a naturally spawning Chinook population. The hatchery would also produce up to 5,000 resident Yellowstone cutthroat trout for release in an isolated oxbow lake within the Fort Hall Reservation permit fishing area in the upper Snake River subbasin. Biologists would monitor Chinook salmon in Yankee Fork and Panther Creek and Yellowstone cutthroat trout in the oxbow lake to inform decisions on hatchery operations. With this Notice of Intent, BPA is initiating the public scoping process for the EIS. BPA and the USFS are requesting comments about potential environmental impacts that should be considered as an EIS is prepared. In accordance with DOE regulations for compliance with floodplain and wetlands environmental review requirements, BPA will prepare a floodplain and wetlands assessment to avoid or minimize potential harm to or within any affected floodplains and wetlands. The assessment will be included in the EIS.