Department of Energy July 17, 2013 – Federal Register Recent Federal Regulation Documents
Results 1 - 2 of 2
Test Procedures for Showerheads, Faucets, Water Closets, Urinals, and Commercial Prerinse Spray Valves: Public Meeting
The U.S. Department of Energy (DOE) will hold a public meeting to discuss methodologies and gather comments on DOE's proposed test method for verifying the amount of force required to remove the flow control insert of showerheads for purposes of amending DOE test procedures. In addition, DOE encourages written comments on these subjects.
Cumberland System
The Deputy Secretary, Department of Energy, extended on an interim basis rate schedules CBR-1-H, CSI-1-H, CEK-1-H, CM-1-H, CC-1-I, CK-1-H, CTV-1-H, CTVI-1-A, and Replacement-3. These rate schedules are applicable to Southeastern power sold to existing preference customers in Alabama, Georgia, Illinois, Kentucky, Mississippi, North Carolina, Tennessee, and Virginia. The rate schedules are extended through September 30, 2015.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.