Department of Energy June 14, 2013 – Federal Register Recent Federal Regulation Documents

Decision and Order Granting a Waiver to Samsung From the Department of Energy Residential Refrigerator and Refrigerator-Freezer Test Procedures
Document Number: 2013-14169
Type: Notice
Date: 2013-06-14
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy
The U.S. Department of Energy (DOE) gives notice of its decision and order in Case No. RF-027 that grants to Samsung Electronics America, Inc. (Samsung) a waiver from the DOE electric refrigerator and refrigerator-freezer test procedures for specific basic models set forth in its petition for waiver. In its petition, Samsung provides an alternate test procedure that is identical to the test procedure DOE published in a final rule dated January 25, 2012 that manufacturers will be required to use starting in 2014. Under today's decision and order, Samsung shall be required to test and rate these refrigerator-freezers using an alternate test procedure as adopted in that January 2012 final rule, which accounts for multiple defrost cycles when measuring energy consumption.
Decision and Order Granting a Waiver to Samsung From the Department of Energy Residential Refrigerator and Refrigerator-Freezer Test Procedures
Document Number: 2013-14166
Type: Notice
Date: 2013-06-14
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy
The U.S. Department of Energy (DOE) gives notice of the decision and order (Case No. RF-026) that grants to Samsung Electronics America, Inc. (Samsung) a waiver from the DOE electric refrigerator and refrigerator-freezer test procedures for the basic models set forth in its petition for waiver. In its petition, Samsung provides an alternate test procedure to address the difficulties in testing dual compressor systems using the currently applicable DOE test procedure. Under today's decision and order, Samsung shall be required to test and rate these refrigerator-freezers using an alternate test procedure that takes dual compressors into account when measuring energy consumption.
Decision and Order Granting a Waiver to Samsung From the Department of Energy Residential Refrigerator and Refrigerator-Freezer Test Procedures
Document Number: 2013-14164
Type: Notice
Date: 2013-06-14
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy
The U.S. Department of Energy (DOE) gives notice of its decision and order in Case No. RF-025 that grants to Samsung Electronics America, Inc. (Samsung) a waiver from the DOE electric refrigerator and refrigerator-freezer test procedures for specific basic models set forth in its petition for waiver. In its petition, Samsung provides an alternate test procedure that is identical to the test procedure DOE published in a final rule dated January 25, 2012 that manufacturers will be required to use starting in 2014. Under today's decision and order, Samsung shall be required to test and rate these refrigerator-freezers using an alternate test procedure as adopted in that January 2012 final rule, which accounts for multiple defrost cycles when measuring energy consumption.
Notice of Petition for Waiver of Panasonic Appliances Refrigeration Systems Corporation of America Corporation (PAPRSA) From the Department of Energy Residential Refrigerator and Refrigerator-Freezer Test Procedure and Grant of Interim Waiver
Document Number: 2013-14163
Type: Notice
Date: 2013-06-14
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy
This notice announces receipt of a petition for waiver from Panasonic Appliances Refrigeration Systems Corporation of America (PAPRSA) seeking an exemption from specified portions of the U.S. Department of Energy (DOE) test procedure for determining the energy consumption of electric refrigerators and refrigerator-freezers. PAPRSA's request pertains to the specific hybrid wine chiller/beverage center basic models set forth in its petition. PAPRSA seeks permission to use an alternate test procedure to test the wine chiller compartment of these devices at 55 [deg]F instead of the prescribed temperature of 38 [deg]F. That procedure would apply a K factor (correction factor) value of 0.85 when calculating the energy consumption of a tested model and replace the energy consumption calculation currently required under 10 CFR Part 430, Appendix A1. DOE solicits comments, data, and information concerning PAPRSA's petition and the suggested alternate test procedure. Today's notice also grants PAPRSA with an interim waiver from the electric refrigerator-freezer test procedure, subject to use of the alternative test procedure set forth in this notice.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.