Department of Energy February 27, 2013 – Federal Register Recent Federal Regulation Documents

Agency Information Collection Extension
Document Number: 2013-04546
Type: Notice
Date: 2013-02-27
Agency: Department of Energy, U.s. Energy Information Administration
The EIA, pursuant to the Paperwork Reduction Act of 1995, intends to extend for three years with the Office of Management and Budget (OMB), Form FE-746R, ``Natural Gas Imports and Exports.'' Comments are invited on: (a) Whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including whether the information shall have practical utility; (b) the accuracy of the agency's estimate of the burden of the proposed collection of information, including the validity of the methodology and assumptions used; (c) ways to enhance the quality, utility, and clarity of the information to be collected; and (d) ways to minimize the burden of the collection of information on respondents, including through the use of automated collection techniques or other forms of information technology.
Pangea LNG (North America) Holdings, LLC; Application for Long-Term Authorization To Export Liquefied Natural Gas Produced From Domestic Natural Gas Resources to Non-Free Trade Agreement Countries for a 25-Year Period
Document Number: 2013-04540
Type: Notice
Date: 2013-02-27
Agency: Department of Energy
The Office of Fossil Energy (FE) of the Department of Energy (DOE) gives notice of receipt of an application (Application) filed on December 19, 2012, by Pangea LNG (North America) Holdings, LLC (Pangea), requesting long-term, multi-contract authorization to export domestically produced liquefied natural gas (LNG) in an amount up to the equivalent of 398.5 billion cubic feet (Bcf) per year (Bcf/y) of natural gas (equal to 1.09 Bcf/day of natural gas), the equivalent of 8 million metric tons per annum (mtpa), from its proposed South Texas LNG Export Project (ST LNG Project) located at the Port of Corpus Christi in Ingleside, Texas. Pangea requests this authorization for a 25-year term commencing on the earlier of the date of first export or seven years from the date the requested authorization is granted. The LNG would be exported to any country (1) with which the United States does not have a free trade agreement (FTA) requiring national treatment for trade in natural gas, (2) that has developed or in the future develops the capacity to import LNG via ocean-going carrier, and (3) with which trade is not prohibited by U.S. law or policy. Pangea is requesting this authorization to export LNG both on its own behalf and as agent for other parties who hold title to the LNG at the point of export. The Application was filed under section 3 of the Natural Gas Act (NGA). Protests, motions to intervene, notices of intervention, and written comments are invited.
Combined Notice of Filings
Document Number: 2013-04494
Type: Notice
Date: 2013-02-27
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings #1
Document Number: 2013-04493
Type: Notice
Date: 2013-02-27
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings #2
Document Number: 2013-04432
Type: Notice
Date: 2013-02-27
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings #1
Document Number: 2013-04431
Type: Notice
Date: 2013-02-27
Agency: Department of Energy, Federal Energy Regulatory Commission
Regional Reliability Standard PRC-006-NPCC-1- Automatic Underfrequency Load Shedding
Document Number: 2013-04430
Type: Rule
Date: 2013-02-27
Agency: Department of Energy, Federal Energy Regulatory Commission
Under section 215 of the Federal Power Act (FPA), the Federal Energy Regulatory Commission (Commission) approves regional Reliability Standard PRC-006-NPCC-1 (Automatic Underfrequency Load Shedding), submitted to the Commission for approval by the North American Electric Reliability Corporation (NERC). Regional Reliability Standard PRC-006- NPCC-1 applies to generator owners, planning coordinators, distribution providers, and transmission owners in the Northeast Power Coordinating Council Region. Regional Reliability Standard PRC-006-NPCC-1 is designed to ensure the development of an effective automatic underfrequency load shedding (UFLS) program to preserve the security and integrity of the Bulk-Power System during declining system frequency events, in coordination with the NERC continent-wide UFLS Reliability Standard PRC-006-1. The Commission approves the related violation risk factors, violation severity levels, implementation plan, and effective dates proposed by NERC.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.