Department of Energy August 4, 2011 – Federal Register Recent Federal Regulation Documents

Energy Efficiency Program: Test Procedure for Lighting Systems (Luminaires)
Document Number: 2011-19780
Type: Notice
Date: 2011-08-04
Agency: Department of Energy
The U.S. Department of Energy (``DOE'' or the ``Department'') is currently evaluating energy efficiency test procedures for luminaires (also referred to herein as lighting systems) and collecting information for the labeling of such products. DOE recognizes that well-designed test procedures are important to produce reliable, repeatable, and consistent test results and that labeling assists informed consumer choice. The existing luminaire test procedures DOE is evaluating include those already established by the National Electrical Manufacturers Association (NEMA) and ENERGY STAR, which include by reference numerous test procedures established by the American National Standards Institute (ANSI), the Illuminating Engineering Society of North America (IESNA), the International Commission on Illumination (Commission Internationale de l'Eclairage (CIE)), and the Illuminating Engineering Society of North America (IESNA). To inform interested parties, facilitate its consideration of appropriate test procedures, and collect information on labeling, DOE seeks comment and requests information related to test procedures and labels for lighting systems based on industry-standard procedures and practices for luminaires. In particular, DOE is interested in if and how test procedures and labels may include controls for powering the luminaire on or off depending on time of day, daylight or occupancy sensor readings and other factors.
Pick-Sloan Missouri Basin Program-Eastern Division-2021 Power Marketing Initiative Proposal
Document Number: 2011-19777
Type: Notice
Date: 2011-08-04
Agency: Department of Energy, Western Area Power Administration
Western Area Power Administration (Western), Upper Great Plains Region, a Federal power marketing agency of the Department of Energy (DOE) published the proposed 2021 Power Marketing Initiative (2021 PMI) in the Federal Register on March 4, 2011. The proposed 2021 PMI provides the basis for marketing the long-term firm hydroelectric resources of the Pick-Sloan Missouri Basin ProgramEastern Division (P-SMBPED) beyond December 31, 2020, when Western's Firm Electric Service contracts associated with the current marketing plan will expire. The proposed 2021 PMI extends the current P-SMBPED marketing plan, with amendments to the contract term and resource pools marketing plan principles. The comment period for the proposed 2021 PMI ended on May 4, 2011. Western received a comment requesting additional time to supplement comments on the proposed 2021 PMI. This Federal Register notice re-opens the written comment period for the proposed 2021 PMI until September 6, 2011.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.