Department of Energy October 19, 2010 – Federal Register Recent Federal Regulation Documents
Results 1 - 8 of 8
Commission Information Collection Activities (FERC-537); Comment Request; Extension
In compliance with the requirements of section 3506(c)(2)(A) of the Paperwork Reduction Act of 1995, 44 U.S.C. 3506(c)(2)(A) (2006), (Pub. L. 104-13), the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the proposed information collection described below.
Energy Conservation Program: Certification, Compliance, and Enforcement for Consumer Products and Commercial and Industrial Equipment
This document announces an extension of the time period for submitting written comments on the notice of proposed rulemaking, regarding the Energy Conservation Program: Certification, Compliance, and Enforcement for Consumer Products and Commercial and Industrial Equipment. The comment period is extended to October 29, 2010.
Revised Record of Decision for Offer of Conditional Commitment for a Loan Guarantee for, and Electrical Interconnection of, the Shepherds Flat Wind Project
The U.S. Department of Energy announces its decisions to provide a conditional loan guarantee for, and interconnection to the Federal Columbia River Transmission System (FCRTS) of, the 846-megawatt (MW) Shepherds Flat Wind Project (Wind Project) in Gilliam and Morrow counties, Oregon. This ROD revises a previous BPA ROD approving the interconnection of the Wind Project to the FCRTS that was issued on July 18, 2008. The Revised ROD reflects the decisions with regard to the Wind Project for: The issuance by BPA of modified Large Generator Interconnection Agreements (LGIAs); and the offer by LP of a conditional commitment for a loan guarantee to Caithness Shepherds Flat, LLC (CSF) for construction of the Wind Project. The Revised ROD also addresses the division of the previously approved Wind Project into three separate projects, and the transfer of these projects to three separate subsidiaries of CSF that will result in additional turbines, adjustments of site boundaries and additional acreage.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.