Department of Energy September 15, 2010 – Federal Register Recent Federal Regulation Documents
Results 1 - 12 of 12
Delta-Mendota Canal Intertie Project
The U.S. Department of Energy (DOE), Western Area Power Administration (Western), plans to authorize a new interconnection and design, construct, own, operate, and maintain a new 69-kilovolt (kV) transmission line and fiber optic cable for delivery of project use power as part of the Department of the Interior, Bureau of Reclamation, Mid-Pacific Region's (Reclamation) Delta-Mendota Canal (DMC)/California Aqueduct Intertie (Intertie) project. The Intertie, including the interconnection to Western's system and transmission line and fiber optic cable, was analyzed in a Reclamation Environmental Impact Statement (EIS) with the Final EIS dated and released in November 2009. The EIS was developed in compliance with the National Environmental Policy Act (NEPA). Reclamation issued a Record of Decision (ROD) dated December 28, 2009, to proceed with the Intertie, described as its Proposed Action in the EIS. The Intertie would be located in Alameda County, California, and involves constructing and operating a pumping plant, a pipeline connection between the DMC and the California Aqueduct at Mile 7.2 of the DMC and Mile 9 of the California Aqueduct, a switchyard, access roads, and the transmission line. Reclamation served as the lead agency in the preparation of the NEPA documents for this project. Western, in accordance with the Council on Environmental Quality (CEQ) Regulations for Implementing NEPA (40 CFR Parts 1500-1508) and DOE NEPA Implementing Procedures (10 CFR Part 1021), served as a cooperating agency. Western adopted the EIS in March 2010 (DOE/EIS-0398) to meet its NEPA responsibilities for its transmission actions in support of the Intertie.
Energy Conservation Standards for Battery Chargers and External Power Supplies: Public Meeting and Availability of the Preliminary Technical Support Document
The U.S. Department of Energy (DOE) will hold a public meeting to discuss and receive comments on the following: the product classes DOE plans to analyze for the purposes of amending energy conservation standards for Class A external power supplies (EPSs) and establishing energy conservation standards for battery chargers (BCs) and non-Class A EPSs; the analytical framework, models, and tools DOE is using to evaluate standards for these products; the results of preliminary analyses performed by DOE for these products; and potential energy conservation standard levels derived from these analyses that DOE could consider for these products. DOE also encourages interested parties to submit written comments on these subjects. To inform stakeholders and facilitate the public meeting and comments process, DOE has prepared an agenda, a preliminary technical support document (TSD), and briefing materials, which are available at: https://www1.eere.energy.gov/ buildings/appliancestandards/residential/batteryexternal.html .
Commission Information Collection Activities (FERC-725E); Comment Request; Submitted for OMB Review
In compliance with the requirements of section 3507 of the Paperwork Reduction Act of 1995, 44 U.S.C. 3507, the Federal Energy Regulatory Commission (Commission or FERC) has submitted the information collection described below to the Office of Management and Budget (OMB) for review of the information collection requirements. Any interested person may file comments directly with OMB and should address a copy of those comments to the Commission as explained below. The Commission issued a Notice in the Federal Register (75 FR 35002, 6/ 21/2010) requesting public comments. FERC received no comments on the FERC-725E and has made this notation in its submission to OMB.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.