Department of Energy September 25, 2009 – Federal Register Recent Federal Regulation Documents

Notice of Interim Approval
Document Number: E9-23233
Type: Notice
Date: 2009-09-25
Agency: Department of Energy
The Deputy Secretary of the Department of Energy, confirmed and approved, on an interim basis, Rate Schedules JW-1-I and JW-2-F. The rates were approved on an interim basis through September 19, 2014, and are subject to confirmation and approval by the Federal Energy Regulatory Commission (Commission) on a final basis.
Assistance Regulations; Correction
Document Number: E9-23188
Type: Rule
Date: 2009-09-25
Agency: Department of Energy
The Department of Energy (DOE) is correcting a final rule that appeared in the Federal Register of August 28, 2009 (74 FR 44273). In this document, DOE amended its Financial Assistance Regulations to update, streamline, and simplify the general rules, and also removed regulations governing the DOE Financial Assistance Appeals Board.
Record of Decision: Montana Alberta Tie Limited (DOE/EIS-0399)
Document Number: E9-23186
Type: Notice
Date: 2009-09-25
Agency: Department of Energy, Western Area Power Administration
The Western Area Power Administration (Western), an agency of the U.S. Department of Energy (DOE), has decided to finance a portion of the Montana Alberta Tie Ltd. (MATL) 230-kilovolt (kV) transmission line (MATL Project) in exchange for ownership of 50 megawatts (MW) of southbound capacity on the line and ownership of approximately 18 miles of transmission line. This decision is contingent on the MATL Project meeting all necessary conditions under Western's Transmission Infrastructure Program (TIP). MATL proposed to construct, operate, maintain, and connect a new 214-mile, single-circuit 230-kV electric transmission line across the U.S.-Canada border near Cut Bank, Montana, and DOE prepared the Environmental Impact Statement for the Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line (DOE/EIS-0399), herein referred to as the MATL Environmental Impact Statement (EIS), as co- lead with the State of Montana, to analyze the environmental impacts that would be associated with construction and operation of the line. The environmental mitigation measures and electric reliability conditions required by DOE's permit for the line are identified in the Record of Decision (ROD); Montana Alberta Tie Ltd. issued by DOE on November 17, 2008, (73 FR 67860), herein referred to as the first ROD.
Agency Information Collection Activities: Submission for OMB Review; Comment Request
Document Number: E9-23185
Type: Notice
Date: 2009-09-25
Agency: Department of Energy, Energy Information Administration
The EIA has submitted the Residential Energy Consumption Survey to the Office of Management and Budget (OMB) for review and a reinstatement under section 3507(h)(1) of the Paperwork Reduction Act of 1995 (Pub. L. 104-13) (44 U.S.C. 3501 et seq).
Revised Filing Requirements for Centralized Service Companies Under the Public Utility Holding Company Act of 2005, the Federal Power Act, and the Natural Gas Act
Document Number: E9-22851
Type: Proposed Rule
Date: 2009-09-25
Agency: Department of Energy, Federal Energy Regulatory Commission
In this Notice of Proposed Rulemaking, the Federal Energy Regulatory Commission proposes to revise the Commission's regulations to require every centralized service company that provides non-power services to any public utility, natural gas company, or both, to file Form No. 60 (Annual Report of Centralized Service Companies) annually and abide by the Uniform System of Accounts, unless exempted or granted a waiver pursuant to our regulations.