Department of Energy June 26, 2009 – Federal Register Recent Federal Regulation Documents

Transwestern Pipeline Company, LLC; Notice of Request Under Blanket Authorization
Document Number: E9-15208
Type: Notice
Date: 2009-06-26
Agency: Department of Energy, Federal Energy Regulatory Commission
Hoosier Wind Project, LLC; Notice of Filing
Document Number: E9-15207
Type: Notice
Date: 2009-06-26
Agency: Department of Energy, Federal Energy Regulatory Commission
Lost Creek Wind, LLC; Notice of Filing
Document Number: E9-15206
Type: Notice
Date: 2009-06-26
Agency: Department of Energy, Federal Energy Regulatory Commission
Electric Quarterly Reports; PowerGrid Systems, Inc. Order on Intent To Revoke Market-Based Rate Authority
Document Number: E9-15205
Type: Notice
Date: 2009-06-26
Agency: Department of Energy, Federal Energy Regulatory Commission
Upper Peninsula Power Company; Notice of Filing
Document Number: E9-15150
Type: Notice
Date: 2009-06-26
Agency: Department of Energy, Federal Energy Regulatory Commission
Jayhawk Pipeline, L.L.C.; Notice of Request for Temporary Waiver of Tariff Filing and Reporting Requirements
Document Number: E9-15143
Type: Notice
Date: 2009-06-26
Agency: Department of Energy, Federal Energy Regulatory Commission
Application To Export Electric Energy; Exelon Generation Company, LLC
Document Number: E9-15129
Type: Notice
Date: 2009-06-26
Agency: Department of Energy
Exelon Generation Company, LLC (Exelon) has applied to renew its authority to transmit electric energy from the United States to Canada pursuant to section 202(e) of the Federal Power Act.
Application To Export Electric Energy; Twin Cities Energy, L.L.C.
Document Number: E9-15127
Type: Notice
Date: 2009-06-26
Agency: Department of Energy
Twin Cities Energy, L.L.C. (Twin Cities) has applied for authority to transmit electric energy from the United States to Canada pursuant to section 202(e) of the Federal Power Act.
Variance for Certain Requirements for the Electric Drive Vehicle Battery and Component Manufacturing Initiative Under the Department of Energy's National Environmental Policy Act Implementing Procedures
Document Number: E9-15126
Type: Notice
Date: 2009-06-26
Agency: Department of Energy
This notice announces the Department of Energy's (DOE's) decision, pursuant to 10 CFR 1021.343(c), that it is in the interest of public welfare to grant a variance from certain requirements of its National Environmental Policy Act (NEPA) Implementing Procedures (10 CFR part 1021) in regard to the review of applications under the Electric Drive Vehicle Battery and Component Manufacturing Initiative funded by the American Recovery and Reinvestment Act of 2009 (Recovery Act). The variance is limited to certain requirements identified in 10 CFR 1021.216, Procurement, Financial Assistance, and Joint Ventures. The variance in no way affects the requirement to prepare an environmental assessment or environmental impact statement for any application selected for funding. The merit review of applications in response to this funding opportunity will include consideration of the potentially significant environmental impacts of the projects proposed for funding that are within the competitive range. By providing this variance, DOE can reduce the time needed to select applications for possible future funding consistent with the sense of urgency underpinning the Recovery Act.
Big Stone II Power Plant and Transmission Project Final Environmental Impact Statement (DOE/EIS-0377)
Document Number: E9-15125
Type: Notice
Date: 2009-06-26
Agency: Department of Energy, Western Area Power Administration
The Western Area Power Administration (Western) announces the availability of the Big Stone II Power Plant and Transmission Project (Project) Final Environmental Impact Statement (EIS). This Final EIS analyzes the environmental impacts of constructing and operating the proposed Project. Western is considering whether to grant a request to interconnect the proposed Project with Western's transmission system at Morris and Granite Falls substations in Minnesota, an action which requires Western to complete modifications to these substations to support the interconnection.\1\ The U.S. Army Corps of Engineers (USACE) participated as a cooperating agency in the EIS process. USACE is considering whether to issue a permit for Section 10 of the Rivers and Harbors Act and for Section 404 of the Clean Water Act for construction of the proposed Project within or across navigable waters and waters of the United States.
Construction, Operation, and Maintenance of the Proposed Transmission Agency of Northern California Transmission Project, California
Document Number: E9-15048
Type: Notice
Date: 2009-06-26
Agency: Department of Energy, Western Area Power Administration
On February 23, 2009, Western Area Power Administration (Western), an agency of the Department of Energy (DOE), announced the Notice of Intent to prepare an Environmental Impact Statement/ Environmental Impact Report (EIS/EIR) for the construction, operation, and maintenance of the proposed Transmission Agency of Northern California (TANC) Transmission Project. In that notice, Western described the schedule for scoping meetings and advised the public that comments on the scope of the EIS/EIR were due by April 30, 2009. On May 8, 2009, Western published a notice in the Federal Register extending the comment period to May 31, 2009. By this notice, Western extends the due date for comments on the scope of the EIS/EIR to July 30, 2009.
Pick-Sloan Missouri Basin Program-Eastern Division-Rate Order No. WAPA-148
Document Number: E9-15047
Type: Notice
Date: 2009-06-26
Agency: Department of Energy, Western Area Power Administration
The Western Area Power Administration (Western) proposes to add a penalty rate for Unreserved Use of Transmission Service for the Pick-Sloan Missouri Basin ProgramEastern Division (P-SMBPED) in a new rate schedule, Rate Schedule UGP-TSP1. The new rate schedule for Unreserved Use of Transmission System Penalties, Rate Schedule UGP- TSP1, is proposed to go into effect on the later of January 1, 2010, or when Western's Open Access Transmission Tariff (OATT) is revised to provide for Unreserved Use Penalties. Prior to implementing the penalty rate, Western will post notice on its Open Access Same-Time Information System (OASIS) Web site. If Rate Schedule UGP-TSP1 is implemented, it will remain in effect through December 31, 2014, or until superseded. Western will prepare a brochure that provides detailed information on the proposed rate to all interested parties. Publication of this Federal Register notice begins the formal process for the proposed penalty rate.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.