Department of Energy May 28, 2009 – Federal Register Recent Federal Regulation Documents

Blanket Authorization Under FPA Section 203
Document Number: E9-12381
Type: Rule
Date: 2009-05-28
Agency: Department of Energy, Federal Energy Regulatory Commission
The Federal Energy Regulatory Commission (Commission) adopts reporting requirements under the expanded blanket authorization established in Order No. 708-A, which amends section 33.1(c)(12) of the Commission's regulations.
Combined Notice of Filings #1
Document Number: E9-12353
Type: Notice
Date: 2009-05-28
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings # 1
Document Number: E9-12352
Type: Notice
Date: 2009-05-28
Agency: Department of Energy, Federal Energy Regulatory Commission
Western Electricity Coordinating Council Regional Reliability Standard Regarding Automatic Time Error Correction
Document Number: E9-12351
Type: Rule
Date: 2009-05-28
Agency: Department of Energy, Federal Energy Regulatory Commission
Pursuant to section 215 of the Federal Power Act (FPA), the Federal Energy Regulatory Commission (Commission) approves regional Reliability Standard BAL-004-WECC-01 (Automatic Time Error Correction), as submitted by the North American Electric Reliability Corporation. As a separate action, pursuant to section 215(d)(5) of the FPA, the Commission directs the Western Electricity Coordinating Council to develop several modifications to the regional Reliability Standard. The regional Reliability Standard requires balancing authorities within the Western Interconnection to maintain interconnection frequency within a predefined frequency profile and ensure that time error corrections are effectively conducted in a manner that does not adversely affect the reliability of the Interconnection.
Transmission Relay Loadability Reliability Standard
Document Number: E9-12350
Type: Proposed Rule
Date: 2009-05-28
Agency: Department of Energy, Federal Energy Regulatory Commission
Pursuant to section 215 of the Federal Power Act, the Federal Energy Regulatory Commission proposes to approve Reliability Standard PRC-023-1 (Transmission Relay Loadability Reliability Standard) developed by the North American Electric Reliability Corporation. The proposed Reliability Standard requires certain transmission owners, generator owners, and distribution providers to set protective relays according to specific criteria in order to ensure that the relays reliably detect and protect the electric network from all fault conditions, but do not limit transmission loadability or interfere with system operators' ability to protect system reliability. While all relays detect and protect the electric network from fault conditions, the proposed Reliability Standard applies only to load-responsive phase protection relays. In addition, pursuant to section 215(d)(5) of the Federal Power Act, the Commission proposes to direct NERC to develop
Electric Reliability Organization Interpretations of Specific Requirements of Frequency Response and Bias and Voltage and Reactive Control Reliability Standards
Document Number: E9-12348
Type: Rule
Date: 2009-05-28
Agency: Department of Energy, Federal Energy Regulatory Commission
Pursuant to section 215 of the Federal Power Act, the Federal Energy Regulatory Commission hereby approves the North American Electric Reliability Corporation's (NERC) interpretation of one Commission- approved Reliability Standard, BAL-003-0, Frequency Response and Bias; and remands NERC's proposed interpretation of VAR-001-1, Voltage and Reactive Control, for reconsideration consistent with this Final Rule.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.