Department of Energy November 3, 2008 – Federal Register Recent Federal Regulation Documents
Results 1 - 8 of 8
Agency Information Collection Extension; Correction
The Department of Energy (DOE) published a document in the Federal Register of September 18, 2008, announcing the submission of an information request to the OMB for the Foreign Travel Management System (FTMS). This document corrects errors in that notice.
Sam Rayburn Dam Power Rate
The Administrator, Southwestern Power Administration (Southwestern), has prepared Current and Revised 2008 Power Repayment Studies that show the need for an increase in annual revenues to meet cost recovery criteria. Such increased revenues are required primarily due to increases in U.S. Army Corps of Engineers' operations and maintenance estimates. The Administrator has developed a proposed Sam Rayburn Dam rate schedule, which is supported by a power repayment study, to recover the required revenues. Beginning January 1, 2009, the proposed rates would increase annual revenues approximately 14.3 percent from $3,456,696 to $3,949,872.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.