Department of Energy December 4, 2006 – Federal Register Recent Federal Regulation Documents

Notice of Application Accepted for Filing and Soliciting Motions To Intervene, Protests, and Comments
Document Number: E6-20472
Type: Notice
Date: 2006-12-04
Agency: Department of Energy, Federal Energy Regulatory Commission
Notice of Application Accepted for Filing and Soliciting Motions To Intervene, Protests and Comments
Document Number: E6-20471
Type: Notice
Date: 2006-12-04
Agency: Department of Energy, Federal Energy Regulatory Commission
Horizon Power and Light, LLC; Notice of Issuance of Order
Document Number: E6-20470
Type: Notice
Date: 2006-12-04
Agency: Department of Energy, Federal Energy Regulatory Commission
Brazos Electric Power Cooperative, Inc.; Notice of Filing
Document Number: E6-20469
Type: Notice
Date: 2006-12-04
Agency: Department of Energy, Federal Energy Regulatory Commission
Combined Notice of Filings #1
Document Number: E6-20466
Type: Notice
Date: 2006-12-04
Agency: Department of Energy, Federal Energy Regulatory Commission
East Tennessee Natural Gas, LLC; Notice of Compliance Filing
Document Number: E6-20465
Type: Notice
Date: 2006-12-04
Agency: Department of Energy, Federal Energy Regulatory Commission
Dauphin Island Gathering Partners; Notice of Proposed Changes in FERC Gas Tariff
Document Number: E6-20464
Type: Notice
Date: 2006-12-04
Agency: Department of Energy, Federal Energy Regulatory Commission
Enbridge Pipelines (Alabama Intrastate), L.L.C.; Notice of Petition for Rate Approval
Document Number: E6-20463
Type: Notice
Date: 2006-12-04
Agency: Department of Energy, Federal Energy Regulatory Commission
East Tennessee Natural Gas, LLC; Notice of Supplemental Filing
Document Number: E6-20461
Type: Notice
Date: 2006-12-04
Agency: Department of Energy, Federal Energy Regulatory Commission
Tennessee Gas Pipeline Company; Notice of Negotiated Rate Amendments
Document Number: E6-20460
Type: Notice
Date: 2006-12-04
Agency: Department of Energy, Federal Energy Regulatory Commission
Energy Conservation Standards for New Federal Commercial and Multi-Family High-Rise Residential Buildings and New Federal Low-Rise Residential Buildings
Document Number: E6-20439
Type: Rule
Date: 2006-12-04
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy, Energy Efficiency and Renewable Energy Office
The U.S. Department of Energy (DOE) is publishing this interim final rule to implement provisions in the Energy Policy Act of 2005 that require DOE to establish revised energy efficiency performance standards for the construction of all new Federal buildings, including both commercial and multi-family high-rise residential buildings and low-rise residential buildings.
Parker-Davis Project-Post-2008 Resource Pool
Document Number: E6-20438
Type: Notice
Date: 2006-12-04
Agency: Department of Energy, Western Area Power Administration
The Western Area Power Administration (Western), a Federal power marketing agency of the Department of Energy (DOE), announces the Parker-Davis Project (P-DP) Post-2008 Resource Pool Final Allocation of Power (Resource Pool Final Power Allocation), developed under the requirements of the Energy Planning and Management Program (EPAMP). This notice also includes Western's responses to public comments on the proposed allocations published July 17, 2006. The Resource Pool Final Power Allocation documents Western's decisions prior to beginning the contractual phase of the process. Firm electric service contracts, with the allottees in this notice, will extend from October 1, 2008, through September 30, 2028.
Notice of Availability; Draft Environmental Impact Statement for the Western Greenbrier Co-Production Demonstration Project
Document Number: E6-20435
Type: Notice
Date: 2006-12-04
Agency: Department of Energy
The U.S. Department of Energy (DOE) announces the availability of the document, Draft Environmental Impact Statement for the Western Greenbrier Co-Production Demonstration Project, (DOE/EIS-0361), for public comment. The draft environmental impact statement (EIS) analyzes the potential environmental consequences of providing Federal funding for the design, construction, and demonstration of a 98 megawatt (MWe) net power plant and ash byproduct manufacturing facility to be located in the municipality of Rainelle, Greenbrier County, West Virginia. The facility would be constructed and demonstrated through a cooperative agreement between DOE and Western Greenbrier Co-Generation, LLC (WGC) under the Clean Coal Power Initiative (CCPI). WGC proposes to design, construct, and demonstrate an atmospheric pressure circulating fluidized-bed (CFB) power plant that would generate electricity and steam by burning approximately 3,000 to 4,000 tons per day of coal refuse from several local sites as the primary fuel. The proposed power plant would be the first commercial application within the United States of a CFB combustor featuring a compact inverted cyclone design. The Department prepared this draft EIS in accordance with the National Environmental Policy Act of 1969 (NEPA) (42 U.S.C. 4321 et seq.), the Council on Environmental Quality (CEQ) regulations that implement the procedural provisions of NEPA (40 CFR parts 1500-1508), and the DOE procedures implementing NEPA (10 CFR part 1021). DOE's proposed action is to provide cost-shared financial assistance to WGC through a cooperative agreement under the CCPI for design, construction, and operation of the Western Greenbrier Co- Production Demonstration Project. WGC proposes to design, construct, and operate a 98 MWe (net) power plant that would generate electricity and steam by burning fuel derived from the beneficiation of approximately 3,000 to 4,000 tons per day of coal refuse. The proposed power plant would be the first commercial application within the United States of an atmospheric circulating fluidized-bed combustor featuring a compact inverted cyclone design. The design would require less steel and facilitate erection in remote areas by reducing the boiler system footprint and height. These innovations could reduce steel costs by approximately 40 percent and shorten construction time by approximately 10 percent.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.