Application for Presidential Permit; Montana Alberta Tie Ltd.
Montana Alberta Tie Ltd. (MATL) has applied for a Presidential permit to construct, operate, maintain, and connect an electric transmission line across the U.S. border with Canada.
Procedures for Disposition of Contested Audit Matters
Pursuant to section 309 of the Federal Power Act, 16 U.S.C. 825h (2000); section 16 of the Natural Gas Act, 15 U.S.C. 717o (2000); sections 20 and 204(a)(6) of the Interstate Commerce Act, 49 App. U.S.C. 20 and 204(a)(6)(2000); and section 501 of the Natural Gas Policy Act of 1978, 15 U.S.C. 3411 (2000), the Federal Energy Regulatory Commission proposes to issue Rules permitting audited persons to challenge audit findings before the issuance of a Commission order on the merits of those findings. The Commission seeks public comment on the Rules proposed herein.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.