Department of Energy April 25, 2005 – Federal Register Recent Federal Regulation Documents
Results 1 - 2 of 2
Record of Decision and Floodplain Statement of Findings; Imperial-Mexicali 230-kV Transmission Lines
DOE announces its decision to implement the Proposed Action alternative, identified as the preferred alternative, in the ``Final Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines'' (DOE/EIS-0365). That alternative is to grant a Presidential permit to both Baja California Power, Inc. (BCP; hereinafter referred to as Intergen \2\) and Sempra Energy Resources (hereinafter referred to as Sempra \3\) for each to construct, operate, maintain, and connect a double-circuit, 230,000-volt (230-kV) electric transmission line that crosses the U.S.-Mexico border in the vicinity of Calexico, California, and connects to the associated natural gas- fired electric power plant located near Mexicali, Mexico. The permits will authorize the transmission lines to connect to the respective power plants as those plants are presently designed.
Environmental Management Site-Specific Advisory Board, Northern New Mexico
This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EMSSAB), Northern New Mexico. The Federal Advisory Committee Act (Pub. L. No. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.