Engineers Corps December 2005 – Federal Register Recent Federal Regulation Documents
Results 1 - 3 of 3
Intent To Prepare a Draft Environmental Impact Statement/Environmental Impact Report for a Permit Application for a Proposed Marine Terminal Expansion at Piers D, E and F in the Middle Harbor District of the Port of Long Beach, Los Angeles County, CA
The U.S. Army Corps of Engineers (Corps) is considering an application for Section 404 and Section 10 permits to conduct dredge and fill activities to redevelop and consolidate two existing container terminals for the construction of a 342-acre marine terminal including redevelopment of 294 acres of existing land and the placement of dredged material in open water to create 48 acres of new land. The primary reason for the revised notice of intent is because the proposed terminal expansion project has been modified to utilize additional existing land to reduce the amount of fill in open water by approximately 20 acres. The primary Federal concern is the dredging and discharging of materials within waters of the Unites States and potential significant impacts to the human environment. Therefore, in accordance with the National Environmental Policy Act (NEPA), the Corps is requiring the preparation of an Environmental Impact Statement (EIS) prior to consideration of any permit action. The Corps may ultimately make a determination to permit or deny the above project, or permit or deny modified versions of the above project. Pursuant to the California Environmental Quality Act (CEQA), the Port of Long Beach will serve as Lead Agency for the preparation of an Environmental Impact Report (EIR) for its consideration of development approvals within its jurisdiction. The Corps and the Port of Long Beach have agreed to jointly prepare a Draft EIS/EIR in order to optimize efficiency and avoid duplication. The Draft EIS/EIR is intended to be sufficient in scope to address both the Federal and the State and local requirements and environmental issues concerning the proposed activities and permit approvals.
Notice of Availability of the Draft Environmental Impact Statement for the Prado Basin Master Plan, San Bernardino and Riverside Counties, CA
The Environmental Impact Statement (EIS) addresses potential environmental impacts associated with the proposed Prado Basin Master Plan, and identifies recommended measures to reduce such impacts. The Prado Basin Master Plan proposes a range of recreation uses and features for identified planning areas with the Basin. Specific site plans and layouts for these proposed uses would be prepared when future specific development plans are proposed. The impact discussion, in turn, is purposely general in nature, and recommended measures to reduce impacts allow for flexibility. The potential impacts as stated and the commitment to minimize impacts are intended to provide a framework for future proposals. They also provide some guidelines for impacts that will require mitigation; short of making untimely, detailed, recommendations. This approach allows future recreation development sponsors the appropriate flexibility to design and formulate specific mitigation, including the parties responsible for implementation and verification, when details of specific Master Plan development proposals are presented. The U.S. Army Corps of Engineers has cooperated with counterparts in Orange, San Bernardino and Riverside Counties in Developing this Master Plan. Two alternatives are proposed for consideration for the Prado Basin: Adopting the proposed Prado Basin Master Plan, and the No Project alternative. The proposed plan would serve as a guide for orderly and coordinated use, development and management of the land in the Prado Basin. The discussion of affected environment and potential environmental impacts in this Environmental Impact Statement (EIS) are based on evaluation of land use designations proposed in the Basin Master Plan. Specific development proposals within the general land use Planning Areas would require appropriate National Environmental Policy act (NEPA) clearance to specifically address the potential environmental effects of those proposals. The No Project Alternative would eliminate the implementation of the recreation land use contemplated in the proposed Basin Master Plan, and in the continuation of current land use activities on the site. This alternative would result in the Corps being unable to meet its project objectives such as providing for the expressed public interests for recreation.
Upper Columbia Alternative Flood Control and Fish Operations, Libby and Hungry Horse Dams, MT
On November 10, 2005, the Corps of Engineers and the Bureau of Reclamation, Interior, issued a Notice of Availability of a Draft Environmental Impact Statement (DEIS) and Notice of Public Hearings (see 70 CFR 68409). The due date for comments period provided in the DATES section of that notice was incorrectly identified as December 27, 2005. The correct due date for comments is January 3, 2006 (45 days from the November 18, 2005, Federal Register publication date of the EPA weekly notice of DEIS availability).
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.