Army Department June 2, 2006 – Federal Register Recent Federal Regulation Documents
Results 1 - 2 of 2
Availability of the Final Supplemental Environmental Impact Statement for the Boston Harbor Inner Harbor Maintenance Dredging Project
The U.S. Army Corps of Engineers, New England District has prepared a Final Supplemental Environmental Impact Statement to maintenance dredge the following Federal navigation channels: The Main Ship Channel upstream of Spectacle Island to the Inner Confluence, the upper Reserved Channel, the approach to the Navy Dry Dock, a portion of the Mystic River, and a portion of the Chelsea River (previously permitted) in Boston Harbor, MA. Maintenance dredging of the navigation channels landward of Spectacle Island is needed to remove shoals and restore the Federal navigation channels to their authorized depths. Materials dredged from the Federal channels will either be disposed at the Massachusetts Bay Disposal Site (for the material suitable for unconfined open water disposal) or, for the material not suitable for unconfined open water disposal, in confined aquatic disposal (CAD) cell(s). Major navigation channel improvements (deepening) were made in 1999 through 2001 in the Reserved Channel, the Mystic River, Inner Confluence and the Chelsea River. A Final EIS prepared for this previous navigation improvement project in June of 1995 identified selected use of CAD cells in the Mystic River, Inner Confluence, and Chelsea River were investigated. A new CAD cell for the proposed maintenance project will be constructed in the Mystic River and in the Main Ship Channel just below the Inner Confluence.
Availability of the Draft Environmental Impact Statement for the White River Minimum Flow Reallocation Study, AR
Pursuant to section 102(2)(c) of the National Environmental Policy Act (NEPA) of 1969 (as amended), the U.S. Army Corps of Engineers (USACE), Little Rock District, has prepared a Draft Environmental Impact Statement (DEIS) for the proposed implementation of the White River Minimum Flow, Arkansas. This DEIS is being made available for a 45-day public comment period.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.