Department of Defense February 1, 2013 – Federal Register Recent Federal Regulation Documents

Notice of Intent To Prepare an Environmental Impact Statement for Land-Water Interface and Service Pier Extension, Naval Base Kitsap Bangor, Silverdale, WA and To Announce Public Scoping Meetings
Document Number: 2013-02176
Type: Notice
Date: 2013-02-01
Agency: Department of Defense, Department of the Navy
Pursuant to section (102)(2)(c) of the National Environmental Policy Act (NEPA) of 1969 and the regulations implemented by the Council on Environmental Quality (CEQ) (40 CFR parts 1500-1508), the Department of the Navy (DoN) announces its intent to prepare an Environmental Impact Statement (EIS) to evaluate the potential environmental impacts associated with two actions: (1) The proposed construction and operation of Land-Water Interface (LWI) structures and (2) the proposed construction and operation of a Service Pier Extension (SPE) on Naval Base (NAVBASE) Kitsap Bangor. The DoN proposes two projects on NAVBASE Kitsap Bangor waterfront to: (1) Comply with Department of Defense (DoD) directives to protect Navy OHIO Class ballistic missile submarines (TRIDENT submarines) from increased and evolving threats and to prevent the seizure, damage, or destruction of military assets and (2) eliminate deployment constraints and improve maintenance of SEAWOLF Class submarines. The first proposed action includes constructing two LWI structures and modifying the existing floating Port Security Barrier (PSB) system for improved protection of TRIDENT submarines. Construction of the LWI structures would enclose the Navy Waterfront Restricted Area (WRA) on NAVBASE Kitsap Bangor by constructing security barriers in the intertidal zone at the Bangor waterfront. Construction is anticipated to take two years. Construction activities occurring in the water during the first year may involve pile driving and would be conducted July 2015 through February 2016. Once the pile driving is complete, activities other than pile driving may occur in the water up until February 2017. The second proposed action would relocate SEAWOLF Class submarines SSN-21 (SEAWOLF) and SSN-22 (CONNECTICUT) from NAVBASE Kitsap Bremerton to join SSN-23 (JIMMY CARTER) at NAVBASE Kitsap Bangor. The existing Service Pier would be extended and land based associated support facilities would be constructed including a Maintenance Support Facility, and utility upgrades including an emergency power generator, and a parking lot. Shore based facilities constructed on the pier would include a Pier Services and Compressor Building and a pier crane. Construction would occur from April 2015 to March 2017. Construction in the water is planned for July through February of each year, beginning in July 2015 and concluding in February 2017. The relocation would result in the consolidation of berthing and support for the SEAWOLF Class submarines at NAVBASE Kitsap Bangor. NAVBASE Kitsap is the action proponent. The LWI construction and PSB modifications are for the DoN's Strategic Systems Programs (SSP), which directs research, development, manufacturing, test, evaluation, and operational support of the TRIDENT program. The SPE and supporting facilities are for Commander, Submarine Development Squadron Five (CSDS-5). CSDS-5 is the Immediate Superior in Command for all three SEAWOLF Class submarines and four DoN research, development, test, and evaluation (RDT&E) detachments based at NAVBASE Kitsap Bangor. The DoN is the lead federal agency for this action. The DoN is requesting the U.S. Army Corps of Engineers and the National Marine Fisheries Service to be Cooperating Agencies. The DoN will hold public scoping meetings to receive oral and/or written comments on environmental concerns related to the proposed actions, to determine the scope of issues to address in the Draft EIS, and to identify and refine alternatives to the proposed actions. Federal, state, and local agencies, American Indian tribes, and the public are invited to participate in the scoping process. The public scoping meetings will be conducted in English and will be arranged in an informal, open-house format. Attendees will be provided the opportunity to sign in and then visit various stations hosted by DoN representatives and technical staff assigned to provide information and answer questions. Several large display boards will be located throughout the meeting locations to assist attendees in understanding the proposed actions and the alternatives. Fact sheets about the proposed actions and alternatives will be available to attendees. A comment table with comment sheets will be placed in an easily accessible location.
Department of Defense Task Force on the Care, Management, and Transition of Recovering Wounded, Ill, and Injured Members of the Armed Forces; Notice of Federal Advisory Committee Meeting
Document Number: 2013-02172
Type: Notice
Date: 2013-02-01
Agency: Department of Defense, Office of the Secretary
Under the provisions of the Federal Advisory Committee Act of 1972 (5 U.S.C., Appendix, as amended), the Government in the Sunshine Act of 1976 (5 U.S.C. 552b, as amended), and 41 CFR 102-3.150, the Department of Defense announces that the following Federal Advisory Committee meeting of the Department of Defense Task Force on the Care, Management, and Transition of Recovering Wounded, Ill, and Injured Members of the Armed Forces (subsequently referred to as the Task Force) will take place.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.