Department of Defense September 10, 2010 – Federal Register Recent Federal Regulation Documents
Results 1 - 3 of 3
Record of Decision (ROD) for Conversion of the 3rd Armored Cavalry Regiment (3rd ACR) to a Stryker Brigade Combat Team (SBCT) at Fort Hood, TX
The Department of the Army announces a ROD for conversion of the 3rd ACR to an SBCT at Fort Hood and discusses the environmental impacts of this decision. After conversion, the 3rd ACR will provide the Army with a force structure that has the flexibility to respond better to threats in an unpredictable global security environment. The Army's strategic estimate remains that its force requirements will best be met by a robust multiweight force, composed of a mix of Infantry BCTs and Heavy Armor BCTs augmented with the protection and versatility of an additional SBCT. The 3rd ACR at Fort Hood is being selected because the unit will have maximum time to convert and train with new equipment prior to redeploying. In addition, Fort Hood is an installation capable of providing fully modernized training infrastructure, as well as many of the existing garrison support facilities required for an SBCT, and has adequate maneuver space to accommodate SBCT training. The 3rd ACR will begin converting in 2012 and will be complete in Fiscal Year 2014. With this conversion, the Army will have nine SBCTs (eight Active Component and one Reserve Component).
Final Environmental Impact Statement (FEIS) for Grow the Army Actions at Fort Lewis and the Yakima Training Center (YTC), WA
The Department of the Army announces the availability of an FEIS for Fort Lewis and YTC that analyzes the environmental impacts of implementing the decisions in the 2007 Army Growth and Force Structure Realignment Programmatic EIS (also referred to as the Grow The Army PEIS or GTA PEIS) and other ongoing Army realignment and stationing initiatives, such as the potential for Combat Aviation Brigade (CAB) stationing that may potentially effect Fort Lewis and YTC. The Proposed Action could station up to 5,700 Soldiers and their Families at Fort Lewis. The Proposed Action includes the stationing of 1,900 Soldiers directed under the GTA PEIS, the potential additional stationing of up to 1,000 combat service support (CSS) Soldiers, and the potential stationing of a medium Combat Aviation Brigade (CAB) of approximately 2,800 Soldiers for a total of up to 5,700 Soldiers. After reviewing the alternatives analyzed in the FEIS, the Army has identified Alternative 4 as its preferred alternative, which includes all components of the GTA, CSS, and CAB alternatives (up to a total of 5,700 Soldiers and 8,260 family members).
Preparation of a Programmatic Environmental Impact Statement (PEIS) for the Growth, Realignment, and Stationing of Army Aviation Assets
The Army announces its intent to prepare a PEIS for the proposed growth, realignment, and stationing of new and existing Army aviation assets. The proposed action includes the consolidation and reorganization of existing aviation units, and the establishment of one or more Combat Aviation Brigades (CABs). The proposed action will increase the availability of rotary wing assets to meet current and future national security requirements and will allow the Army better to organize existing aviation assets to promote more effective training and force management. The PEIS will evaluate the environmental impacts associated with the proposed action, which includes the construction and renovation of garrison facilities and additional training needed to support the establishment and realignment of aviation units. The Army is considering the following alternatives in the PEIS: (1) Realign and consolidate existing aviation elements of up to a full CAB at Fort Carson (CO) or Joint Base Lewis-McChord (WA); (2) implement those actions discussed in Alternative 1; in addition, establish a new CAB and station it at Fort Carson or Joint Base Lewis-McChord; and, (3) No-Action Alternative that would retain the Army aviation force structure at its current levels, configurations, and locations. No more than one additional CAB would be assigned to either of the stationing locations being considered. As part of Alternatives 1 and 2, aviation units would conduct training on existing training land at either the Yakima Training Center (YTC) (WA) or the Pinon Canyon Maneuver Site (PCMS) (CO) in order to maintain training proficiency and support integrated training with ground units. Land acquisition is not being considered as part of this action. Fort Carson and Joint Base Lewis-McChord are the only stationing alternatives that meet all of the Army's stationing requirements for new CAB stationing. These locations provide an existing runway and airfield, provide adequate maneuver and airspace for CAB operations, and are equipped with existing training ranges that can support CAB training. Each location is currently the home station of three or more ground maneuver Brigade Combat Teams (BCTs), which allows the Army to maximize integrated air/ground training. Joint Base Lewis-McChord and Fort Carson are the only major installations that have three or more BCTs but no CAB dedicated to provide aviation support for training. Additionally, Joint Base Lewis-McChord has many of the existing garrison facilities to accommodate CAB units while Fort Carson has space available to construct additional CAB facilities.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.