Department of Defense March 16, 2007 – Federal Register Recent Federal Regulation Documents
Results 1 - 8 of 8
Notice of Availability for the Final Environmental Impact Statement/Environmental Impact Report for the Burlington Northern Santa Fe (BNSF) Cajon Third Main Track Summit to Keenbrook, San Bernardino County, CA
Pursuant to section 102(2)(c) of the National Environmental Policy Act (NEPA) of 1969 (as amended), the U.S. Army Corps of Engineers, Los Angeles District (Corps) Regulatory Branch, in coordination with the County of San Bernardino and in cooperation with U.S. Forest Service, has completed a Final Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the Burlington Northern Santa Fe (BNSF) Third Main Track Summit to Keenbrook Project. The proposed BNSF project requires authorization pursuant to section 404 of the Clean Water Act for approximately 2.95 acres of fill placement in jurisdictional waters of the United States, including wetlands, to construct 15.9 miles of a new main track through the Cajon Pass in San Bernardino County, California. Three alternatives were co- equally analyzed in the EIS/EIR, including Alternative 1 (Reduced Footprint), Alternative 2 (Standard Engineering Design) and the No Action Alternative, as required by NEPA. As the project proponent and applicant, the BNSF Railway Co. selected Alternative 1 as its preferred alternative. The Corps determined Alternative 1 is the environmentally preferred alternative and the least environmentally damaging practicable alternative pursuant to the 404(b)(1) Guidelines (40 CFR 230.12).
Intent To Prepare an Environmental Impact Statement for the Proposed Placer Vineyards Project, Corps Permit Application Number 199900737
The Placer Vineyards Specific Plan Property Group proposes to construct a mixed-use master planned community with residential, employment, commercial, open space, recreational and public/quasi- public land uses. The Plan provides for 14,132 homes in a variety of housing types, styles, and densities. At full Plan build-out, projected to occur over a 20- to 30-year time period, Placer Vineyards will have a population of approximately 33,000 people, 42 acres of employment centers, 140 acres of retail commercial centers and approximately 930 acres of new parks and open space. This project, as proposed, would result in impacts to approximately 102.7 acres of waters of the United States, including 8.5 acres of temporary impacts to water and wetlands.
Availability of Non-Exclusive, Exclusive License or Partially Exclusive Licensing of U.S. Patent Concerning Methods for Polymerization of Electronic and Photonic Polymers
In accordance with 37 CFR part 404.6, announcement is made of the availability for licensing of U.S. Patent No. US 7,186,791 B2 entitled ``Methods for Polymerization of Electronic and Photonic Polymers'' issued March 6, 2007. This patent has been assigned to the United States Government as represented by the Secretary of the Army.
Availability of Non-Exclusive, Exclusive License or Partially Exclusive Licensing of U.S. Patent Concerning Methods for Polymerization of Electronic and Photonic Polymers
In accordance with 37 CFR part 404.6, announcement is made of the availability for licensing of U.S. Patent No. US 7,186,792 B2 entitled ``Methods for Polymerization of Electronic and Photonic Polymers'' issued March 6 2007. This patent has been assigned to the United States Government as represented by the Secretary of the Army.
Intent To Prepare a Draft Environmental Impact Statement for the Port Canaveral Navigation Improvements Section 203 Feasibility Study Located in Brevard County, FL
The U.S. Army Corps of Engineers (Corps), Jacksonville District intends to prepare a Draft Environmental Impact Statement (DEIS) for the Port Canaveral Improvements Section 203 Feasibility Study. The study is being conducted by the Canaveral Port Authority under authority granted by section 203 of Water Resources Development Act (WRDA) 1986.
Availability for Non-Exclusive, Exclusive, or Partially Exclusive Licensing of U.S. Patent Concerning a Method and Device for the Detection and Track of Targets in High Clutter
In accordance with 37 CFR 404.6 and 404.7, announcement is made of the availability for licensing of the invention set forth in U.S. Patent No. 7,154,433 entitled ``Method and Device for the Detection and Track of Targets in High Clutter,'' issued on December 26, 2006. The United States Government, as represented by the Secretary of the Army, has rights in this invention.
Availability for Non-Exclusive, Exclusive, or Partially Exclusive Licensing of U.S. Patent Concerning a Multiple Pass Faraday Rotation Amplifier
In accordance with 37 CFR 404.6 and 404.7, announcement is made of the availability for licensing of the invention set forth in U.S. Patent No. 7,095,555 entitled ``Multiple Pass Faraday Rotation Amplifier,'' issued on August 22, 2006. The United States Government, as represented by the Secretary of the Army, has rights in this invention.
Federal Acquisition Regulation; FAR Case 2006-013, List of Approved Attorneys, Abstracters, and Title Companies
The Civilian Agency Acquisition Council and the Defense Acquisition Regulations Council (Councils) are proposing to amend the Federal Acquisition Regulation (FAR) to update the procedures for the acceptance of a bond with a security interest in real property.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.