Rural Utilities Service April 2012 – Federal Register Recent Federal Regulation Documents
Results 1 - 2 of 2
Turning Point Solar LLC: Notice of Finding of No Significant Impact
The Rural Utilities Service (RUS) has issued a Finding of No Significant Impact (FONSI) for the Environmental Assessment (EA) associated with a solar generation project. The EA was prepared in accordance with the National Environmental Policy Act (NEPA), the Council on Environmental Quality's (CEQ) regulations for implementing the procedural provisions of NEPA (40 CFR Parts 1500-1508) and RUS's NEPA implementing regulations (7 CFR Part 1794, Environmental Policies and Procedures). The EA evaluates the environmental impacts associated with a potential loan or loan guarantee to Turning Point Solar LLC (Turning Point Solar) for the proposal. RUS is considering funding this proposal.
Specification for 15 kV and 25 kV Primary Underground Power Cable
The Rural Utilities Service (RUS) is amending its regulations regarding electric distribution specifications for 15kV and 25 kV primary underground power cable. This rule will rescind Bulletin 50-70 (U-1), ``REA Specification for 15 kV and 25 kV Primary Underground Power Cable,'' and codify the material which was formerly incorporated by reference. The specifications and standards that appeared in the old RUS Bulletin 50-70 (U-1) will be incorporated by reference and will update the specifications for 15kV and 25kV underground power cable, and provide RUS borrowers with specifications for 35 kV underground power cable for use in 25 kV primary systems. These specifications cover single-phase and multi-phase primary underground power cable which RUS electric borrowers use to construct their rural underground electric distribution systems.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.