Agricultural Marketing Service September 15, 2009 – Federal Register Recent Federal Regulation Documents
Results 1 - 3 of 3
Onions Grown in South Texas; Change in Regulatory Period
The Department of Agriculture (USDA) is adopting, as a final rule, without change, an interim final rule that revised the regulatory period during which minimum grade, size, quality, and maturity requirements are in effect for onions grown in South Texas under Marketing Order No. 959 (order). The interim final rule shortened the regulatory period from March 1 through July 15 to March 1 through June 4. The relaxation in the interim final rule was necessary to enable producers and handlers to compete more effectively in the marketplace.
Oranges, Grapefruit, Tangerines and Tangelos Grown in Florida and Imported Grapefruit; Relaxation of Size Requirements for Grapefruit
The Department of Agriculture (USDA) is adopting, as a final rule, without change, an interim final rule that relaxed the minimum size requirement for white seedless grapefruit prescribed under the marketing order for oranges, grapefruit, tangerines, and tangelos grown in Florida (order) and the grapefruit import regulation. The interim final rule relaxed the minimum size requirement for domestic and import shipments from 3 \9/16\ inches (size 48) to 3 \5/16\ inches (size 56). This change is expected to maximize fresh white seedless grapefruit shipments and provide greater flexibility to handlers and importers.
Domestic Dates Produced or Packed in Riverside County, CA; Changes to Nomination Procedures and a Reporting Date
This rule invites comments on revisions to the nomination procedures and a change to a reporting date under the California date marketing order (order). The order regulates the handling of domestic dates produced or packed in Riverside County, California, and is administered locally by the California Date Administrative Committee (CDAC or committee). This rule would change the method of polling for nominees to the committee and the date on which CDAC Form 6 is due. These changes are expected to assist in the administration of the order by updating and streamlining committee program operations.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.