Department of Agriculture March 20, 2008 – Federal Register Recent Federal Regulation Documents

Notice of Call for Nominations for Appointment of Primary and Alternate Representatives, Santa Rosa and San Jacinto Mountains National Monument Advisory Committee
Document Number: E8-5654
Type: Notice
Date: 2008-03-20
Agency: Department of Agriculture, Forest Service, Department of the Interior, Bureau of Land Management
This notice constitutes an open call to the public to submit nomination applications for the following positions on the Santa Rosa and San Jacinto Mountains National Monument Advisory Committee:
Peanut Promotion, Research, and Information Order; Amendment to Primary Peanut-Producing States and Adjustment of Membership
Document Number: E8-5652
Type: Rule
Date: 2008-03-20
Agency: Agricultural Marketing Service, Department of Agriculture
This rule would add a producer member and alternate from the State of Mississippi to the National Peanut Board (Board). The change was proposed by the Board, which administers the nationally coordinated program, in accordance to the provisions of the Peanut Promotion, Research, and Information Order (Order) which is authorized under the Commodity Promotion, Research, and Information Act of 1996 (1996 Act). This change is made because Mississippi is now considered a major peanut-producing state based on the Board's review of the geographical distribution of the production of peanuts. The Order requires a review of the geographical distribution of the production of peanuts at least every five years. The addition of a member from Mississippi will provide for additional representation from another primary peanut- producing state.
Notice of Decision To Issue Permits for the Importation of Dropwort Leaves With Stems from South Korea Into the Continental United States
Document Number: E8-5651
Type: Notice
Date: 2008-03-20
Agency: Department of Agriculture, Animal and Plant Health Inspection Service
We are advising the public of our decision to begin issuing permits for the importation of dropwort leaves with stems from South Korea into the continental United States subject to the requirements specified in the risk management analysis. Based on the findings of a pest risk analysis, which we made available to the public for review and comment through a previous notice, we believe that the application of one or more designated phytosanitary measures will be sufficient to mitigate the risks of introducing or disseminating plant pests or noxious weeds via the importation of dropwort leaves with stems from South Korea.
Pistachios Grown in California; Changes in Handling Requirements
Document Number: E8-5648
Type: Rule
Date: 2008-03-20
Agency: Agricultural Marketing Service, Department of Agriculture
The Department of Agriculture (USDA) is adopting, as a final rule, without change, an interim final rule changing the handling requirements authorized under the California pistachio marketing order (order). The order regulates the handling of pistachios grown in California and is administered locally by the Administrative Committee for Pistachios (committee). This rule continues in effect the action that suspended the minimum quality requirements, including maximum defects and minimum sizes, for California pistachios. This reduces handler costs and provides handlers more flexibility in meeting customer needs.
Basin Electric Power Cooperative, Inc.: Notice of Intent To Hold Public Scoping Meeting and Prepare an Environmental Assessment
Document Number: E8-5602
Type: Notice
Date: 2008-03-20
Agency: Department of Agriculture, Rural Utilities Service
The Rural Utilities Service (RUS), an Agency delivering the United States Department of Agriculture (USDA) Rural Development Utilities Programs, hereinafter referred to as Rural Development and/or the Agency, intends to hold a public scoping meeting and prepare an Environmental Assessment (EA) in connection with possible impacts related to a project being proposed by Basin Electric Power Cooperative, Inc. (Basin Electric), of Bismarck, North Dakota. The proposal for construction and operation of a wind turbine generation facility referred to as the PrairieWinds-ND1 Project (Project), consists of a 77-turbine, 115 megawatt (MW) facility at a site near Minot, North Dakota.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.