Coast Guard March 28, 2013 – Federal Register Recent Federal Regulation Documents
Results 1 - 3 of 3
Drawbridge Operation Regulations; Saugus River, Saugus and Lynn, MA
The Coast Guard has issued a temporary deviation from the regulation governing the operation of the Route 107 temporary bridge across the Saugus River, mile 2.5, between Saugus and Lynn, Massachusetts. The bridge will not open for vessel traffic during the installation of the moveable span. This deviation allows the bridge to remain closed for six days.
Drawbridge Operation Regulations; Atlantic Intracoastal Waterway, Wrightsville Beach, NC and Northeast Cape Fear River, at Wilmington, NC
The Coast Guard has issued a temporary deviation from the operating schedules that govern two of North Carolina Department of Transportation (NCDOT) bridges: The S.R. 74 Bridge, across the Atlantic Intracoastal Waterway (AIWW), mile 283.1, at Wrightsville Beach, NC, and the Isabel S. Holmes Bridge across the Northeast Cape Fear River, mile 1.0, at Wilmington, NC. This deviation is necessary to accommodate the 6th annual PPD Beach2Battleship iron and half iron distance triathlons. This deviation allows both drawbridges to remain in the closed position during the race.
Drawbridge Operation Regulations; Upper Mississippi River, Rock Island, IL
The Coast Guard has issued a temporary deviation from the operating schedule that governs the Rock Island Railroad and Highway Drawbridge across the Upper Mississippi River, mile 482.9, at Rock Island, Illinois. The deviation is necessary to allow the Quad City Marathon to cross the bridge. This deviation allows the bridge to be maintained in the closed-to-navigation position for four hours.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.