Coast Guard April 6, 2006 – Federal Register Recent Federal Regulation Documents

Drawbridge Operation Regulations; Chelsea River, Chelsea, MA
Document Number: E6-4900
Type: Proposed Rule
Date: 2006-04-06
Agency: Coast Guard, Department of Homeland Security
The Coast Guard proposes to temporarily change the drawbridge operation regulations governing the operation of the P.J. McArdle Bridge, across the Chelsea River at mile 0.3, between East Boston and Chelsea, Massachusetts. This proposed rule would allow the bridge to remain closed from 9 a.m. to 5 p.m. on June 17, 2006, to facilitate the Third Annual Chelsea River Revel Festival and the running of the Chelsea River Revel 5K Road Race. Vessels that can pass under the bridge without a bridge opening may do so at all times.
Drawbridge Operation Regulations; Atlantic Intracoastal Waterway (Alternate Route), Dismal Swamp Canal, NC
Document Number: E6-4899
Type: Proposed Rule
Date: 2006-04-06
Agency: Coast Guard, Department of Homeland Security
The Coast Guard proposes to establish regulations that govern the operation of the new Dismal Swamp Canal Bridge, at the Alternate Route of the Atlantic Intracoastal Waterway (AICW) mile 28.0, in South Mills, NC. The proposed regulations will maintain a level of operational capabilities that will continue to provide for the reasonable needs of the North Carolina Department of Parks and Recreation Visitor Center, at Dismal Swamp, and vessel navigation.
Drawbridge Operation Regulations; Connecticut River, East Haddam, CT
Document Number: 06-3287
Type: Rule
Date: 2006-04-06
Agency: Coast Guard, Department of Homeland Security
The Coast Guard has temporarily changed the drawbridge operating regulations governing the operation of the Route 82 Bridge across the Connecticut River at mile 16.8, at East Haddam, Connecticut. This temporary final rule requires the Route 82 Bridge to operate on a fixed opening schedule from April 1, 2006 through June 30, 2006. The bridge shall open at all times for commercial vessels after at least a 24-hour advance notice and a 2-hour confirmation is given by calling the number posted at the bridge. This temporary final rule is necessary to facilitate electrical and mechanical bridge repairs.
Drawbridge Operation Regulations: Cheesequake Creek, NJ
Document Number: 06-3245
Type: Rule
Date: 2006-04-06
Agency: Coast Guard, Department of Homeland Security
The Coast Guard has changed the regulation that governs the operation of the S35 Bridge across Cheesequake Creek, mile 0.0, at Morgan, South Amboy, New Jersey. This final rule would allow the bridge owner to require mariners to provide a two hour notice for bridge openings between 11 p.m. and 7 a.m. year round and all day from December 1 through March 31. This final rule is expected to better meet the present and the anticipated needs of navigation.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.