Marine Casualties and Investigations; Chemical Testing Following Serious Marine Incidents
Document Number: 05-24375
Type: Rule
Date: 2005-12-22
Agency: Coast Guard, Department of Homeland Security
This final rule revises Coast Guard requirements for alcohol testing after a serious marine incident to ensure that mariners or their employees involved in a serious marine incident are tested for alcohol use within 2 hours of the occurrence of the incident as required under the Coast Guard Authorization Act of 1998. This final rule also requires that most commercial vessels have alcohol testing devices on board, and authorizes the use of saliva as an acceptable specimen for alcohol testing. This rule also makes some minor procedural changes, including a 32-hour time limit for collecting specimens for drug testing following a serious marine incident.
Drawbridge Operation Regulations: Mianus River, CT
Document Number: 05-24337
Type: Rule
Date: 2005-12-22
Agency: Coast Guard, Department of Homeland Security
The Coast Guard has changed the drawbridge operation regulations for the Metro-North Bridge, at mile 1.0, across the Mianus River at Greenwich, Connecticut. This final rule requires the bridge to open on signal from 9 p.m. to 5 a.m., after an advance notice is given. The bridge previously did not open for vessel traffic between 9 p.m. and 5 a.m., daily. This action is expected to better meet the present needs of navigation.
Drawbridge Operation Regulations: Connecticut River, CT
Document Number: 05-24336
Type: Rule
Date: 2005-12-22
Agency: Coast Guard, Department of Homeland Security
The Commander, First Coast Guard District, has issued a temporary deviation from the drawbridge operation regulations for the Amtrak Old Saybrook-Old Lyme Bridge (Old Saybrook-Old Lyme Bridge), mile 3.4, across the Connecticut River, Connecticut. This deviation from the regulations allows the bridge to operate on a fixed schedule for bridge openings and two three-day closures from January 3, 2006 through February 1, 2006. This deviation is necessary in order to facilitate necessary scheduled bridge maintenance.