Bureau of Reclamation December 2007 – Federal Register Recent Federal Regulation Documents
Results 1 - 5 of 5
Grassland Bypass Project Extension, Merced and Fresno Counties, CA
The Bureau of Reclamation (Reclamation) and the San Luis & Delta-Mendota Water Authority (Authority) are preparing a joint EIS/ EIR, pursuant to the National Environmental Policy Act and the California Environmental Quality Act, to evaluate effects of extending the Grassland Bypass Project (Project) until December 31, 2019. The Project's use of the San Luis Drain (Drain) was only authorized until December 31, 2009. Additionally, subsurface drainage flows discharged to Mud Slough (North) were to have met water quality objectives by October 1, 2010, as required by the Regional Water Quality Control Board, Central Valley Region's (CVRWQCB) 1998 Water Quality Control Plan (Basin Plan) for the Sacramento River and San Joaquin River Basins. However, difficulty in acquiring final funding has delayed the development and availability of treatment and disposal technology to reduce selenium loads to meet the 2010 deadline. It is anticipated that the extension to 2019 would allow enough time to acquire funds and develop feasible treatment technology to meet Basin Plan objectives and Waste Discharge Requirements. A scoping meeting will be held to solicit input on alternatives, concerns, and issues to be addressed in the EIS/EIR. Written comments may also be sent.
Red River Valley Water Supply Project, ND
Pursuant to the National Environmental Policy Act (NEPA), the Bureau of Reclamation (Reclamation) is notifying the public that Reclamation and the State of North Dakota have prepared a Final EIS for the Red River Valley Water Supply Project (RRVWSP). The purpose of the RRVWSP is to supply water to meet the water needs of the people and industries in the Red River Valley through the year 2050. The project's needs were established by Congress in the Dakota Water Resources Act of 2000. The project needs are defined as municipal, rural, and industrial supplies; water quality; aquatic environment; and water conservation measures. Reclamation published a Draft EIS on December 30, 2005. Following public comments on the Draft EIS and the addition of new information, Reclamation published a Supplemental Draft EIS on January 31, 2007. The comment period for the Draft EIS started on December 30, 2005 and continued through April 25, 2007 with review of the Supplemental Draft EIS. Revisions were made to the Final EIS to incorporate responses to comments on the Supplemental Draft EIS and new information. However, these revisions do not significantly impact the analysis or results presented in the Supplemental Draft EIS. The primary changes are inclusion of a final biological assessment prepared in compliance with the Endangered Species Act, an analysis of forecasted depletions and sedimentation on the Missouri River mainstem reservoir system, and a literature review of the best available climate change information. The Final EIS includes written responses to all public comments on both the DEIS and SDEIS. It also identifies the GDU Import to Sheyenne River Alternative as Reclamation's and the State of North Dakota's preferred alternative.
Northwest Area Water Supply Project, ND
The Bureau of Reclamation published a notice in the Federal Register on March 6, 2006 (71 FR 11226) announcing the commencement of work under the National Environmental Policy Act on an environmental impact statement for the Northwest Area Water Supply Project (NAWS Project). We are now notifying the public that Reclamation has prepared a Draft EIS which is now available for review and comment. The Draft EIS provides information and analyses related to water treatment for the NAWS Project that would further minimize the transfer of potentially invasive species from the Missouri River basin into the Hudson Bay basin from potential treatment or conveyance failures. The Draft EIS analyzes the potential environmental, cultural, and socioeconomic effects of four alternatives.
Proposed Lower Yuba River Accord, Yuba County, CA
Pursuant to the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA), the Bureau of Reclamation (Reclamation) and the Yuba County Water Agency (YCWA) have prepared the Final EIR/EIS for the Proposed Lower Yuba River Accord (Yuba Accord). The Final EIR/EIS contains responses to comments received on the Draft EIR/EIS. The purpose of the Yuba Accord is to resolve instream flow issues associated with operation of the Yuba River Development Project (Yuba Project) in a way that protects and enhances lower Yuba River fisheries and local water-supply reliability. At the same time, it would provide revenues for local flood control and water supply projects, water for the CALFED Program to use for protection and restoration of Sacramento- San Joaquin Delta (Delta) fisheries, and improvements in statewide water supply management, including supplemental water for the Central Valley Project (CVP) and the State Water Project (SWP). A Notice of Availability of the Draft EIR/EIS was published in the Federal Register on Monday, July 2, 2007 (72 FR 36036). The public review period on the Draft EIR/EIS ended on August 24, 2007.
California Bay-Delta Public Advisory Committee Public Meeting Cancellation; Federal Register: November 9, 2007 (Volume 72, Number 217) [Notices] Page 63628-63629] [DOCID:fr09no07-94] [FR Doc. 07-5597 Filed 11-8-07; 8:45 am]
The Joint meeting of the California Bay-Delta Public Advisory Committee and the California Bay-Delta Authority meeting noticed in the Federal Register on November 8, 2007, Volume 72, Number 217, Page 63628-63629, has been cancelled. The subject meeting will be rescheduled at a later date which is yet to be determined.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.