Bonneville Power Administration; – Federal Register Recent Federal Regulation Documents
Results 1 - 1 of 1
Big Eddy-Knight Transmission Project
BPA intends to prepare an EIS in accordance with the National Environmental Policy Act (NEPA) on the construction, operation, and maintenance of a proposed 500-kilovolt (kV) transmission line and substation. The project would be located in Wasco County, Oregon and Klickitat County, Washington. The new BPA transmission line would extend generally northeast from BPA's existing 500-kV Big Eddy Substation in The Dalles, Oregon, to a new BPA 500-kV substation proposed to be connected to BPA's existing Wautoma-Ostrander 500-kV transmission line approximately 4 miles northwest of Goldendale, Washington. The proposed BPA substation would be called Knight Substation. BPA is considering three routing alternatives for the proposed transmission line; portions of all three routes parallel existing BPA lines in the area. The lengths of the routing alternatives range from about 26 to 28 miles. The proposed Big Eddy-Knight transmission line is needed to increase transmission capacity to respond to requests for transmission service in this area.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.