Engineers Corps October 2010 – Federal Register Recent Federal Regulation Documents
Results 1 - 9 of 9
Withdrawal of Notice for Preparation of an Environmental Impact Statement for the Pine Mountain Dam & Lake Project, AR
The Little Rock District of the U.S. Army Corps of Engineers (Corps) is withdrawing its intent to prepare an Environmental Impact Statement (EIS) for the Pine Mountain Dam & Lake Project, AR. The original Notice of Intent (NOI) was published in the Federal Register on September 25, 2009 (74 FR 48934). The River Valley Regional Water District, sponsor of the study, has recently requested the study be suspended until a later date (to be determined).
Pamlico Sound and Adjacent Waters, NC; Danger Zones for Marine Corps Operations
The U.S. Army Corps of Engineers (Corps) is proposing to amend its regulations to establish one new danger zone in Pamlico Sound near Marine Corps Air Station Cherry Point, North Carolina. Establishment of this danger zone will enable the Marine Corps to control access and movement of persons, vessels, and objects within the danger zone during live fire training exercises.
Intent To Prepare a Draft Supplemental Environmental Impact Statement (SEIS), Mississippi Barrier Island Restoration, Mississippi Coastal Improvements Program (MsCIP) for Hancock, Harrison, and Jackson Counties, MS
The Mobile District, U.S. Army Corps of Engineers (Corps), intends to prepare a Draft Supplemental Environmental Impact Statement (DSEIS) to the MsCIP Comprehensive Plan and Integrated Programmatic EIS, prepared in June 2009, which evaluated comprehensive water resource improvements associated with hurricane and storm damage risk reduction, shoreline erosion, salt water intrusion and fish and wildlife preservation in three coastal counties of Mississippi. As described in the Comprehensive Plan, the SEIS will address potential impacts associated with the comprehensive restoration of the Mississippi barrier islands. These actions are related to the consequences of hurricanes in the Gulf of Mexico in 2005 and will be used as a basis for ensuring compliance with the National Environmental Policy Act (NEPA).
Notice of Availability of Final Environmental Impact Statement for the Sunridge Properties in the Sunridge Specific Plan Area, in Rancho Cordova, Sacramento County, CA, ID SPK-2009-00511
The U.S. Army Corps of Engineers, Sacramento District, (Corps) is issuing a Final Environmental Impact Statement (EIS) which analyzes programmatically the direct, indirect and cumulative effects associated with six residential development projects in the Sunridge Specific Plan area in Rancho Cordova, Sacramento County, CA. The purpose of the EIS is to provide decision-makers and the public with information pertaining to the Proposed Action and alternatives, and disclose environmental impacts and identify mitigation measures to reduce impacts. The Proposed Action is the construction of the six projects (collectively, the ``Sunridge Properties'') which would require the filling of approximately 29.7 acres of waters of the United States, including wetlands. The EIS has been prepared as part of ongoing litigation concerning Department of the Army (DA) permits issued by the Corps between 2005 and 2007 for five of the projects and a pending DA permit decision for the sixth. A stay in the litigation is in place for the Corps to complete the EIS. The EIS was prepared in accordance with the National Environmental Policy Act (NEPA) of 1969, as amended, and the Corps' regulations for NEPA implementation at 33 Code of Federal Regulations parts 230 and 325 Appendix B. The Corps is the lead Federal agency responsible for complying with NEPA and information contained in the EIS serves as the basis for decisions regarding issuance of a DA permit.
Chief of Engineers Environmental Advisory Board
In accordance with Section 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the following committee meeting: Name of Committee: Chief of Engineers Environmental Advisory Board (EAB). Topic: The EAB will discuss national considerations related to ecosystem restoration through integrated water resources management with emphasis on long-term recovery in the Gulf of Mexico, sea level rise in south Florida, and progress and status of South Florida ecosystem restoration. Date of Meeting: October 29, 2010. Place: The Westin Colonnade, 180 Aragon Avenue, Coral Gables, Florida 33134. Time: 9 a.m. to 12 p.m. Thirty minutes will be set aside for public comment. Members of the public who wish to speak are asked to register prior to the start of the meeting. Registration will begin at 8:30 a.m. Statements are limited to 3 minutes.
Intent To Prepare a Draft Environmental Impact Statement for the Louisiana Coastal Area-Plaquemines Parish, LA, Medium Diversion With Dedicated Dredging at Myrtle Grove Feasibility Study
The U.S. Army Corps of Engineers (USACE) intends to prepare a Draft Environmental Impact Statement (EIS) for the Louisiana Coastal Area (LCA)Louisiana, Medium Diversion at Myrtle Grove with Dedicated Dredging project. The proposed restoration feature consists of a diversion, coupled with dedicated dredging, that would allow the reintroduction of freshwater, sediment and nutrients into the critically effected area of the Barataria Basin, which is located in the Ascension, Assumption, Jefferson, Lafourche, Orleans, Plaquemines, St. Charles, St. James, and St. John the Baptist parishes, Louisiana. This particular combination of restoration features would allow for rapid creation of wetland acreage and enable long-term stability. This EIS will be tiered off of the programmatic EIS for the LCA Ecosystem Restoration Study, November 2004. The record of decision for the programmatic EIS was signed on November 18, 2005.
Superior National Forest, Minnesota
The SDEIS will supplement and supersede the Draft EIS of October 27, 2009 (DEIS), which was produced jointly by the US Army Corps of Engineers (USACE) and the Minnesota Department of Natural Resources (MNDNR), released for public comment on November 6, 2009. The SDEIS will respond to concerns about wetlands and water quality issues associated with the NorthMet mining and ore processing proposal, located in Northeast Minnesota, as identified by the US Environmental Protection Agency and other commentors. The SDEIS will also incorporate potential effects from a proposed land exchange between the USDA Superior National Forest (SNF) and PolyMet Mining, Inc. (PolyMet). The SNF will join the USACE and MNDNR as a third lead agency responsible for EIS preparation because the land where the mine is proposed is owned by the SNF. Cooperating Agencies for preparation of the SDEIS include Minnesota Bands of Chippewa/Ojibwe (Bois Forte and Fond du Lac). Others who have requested to become cooperating agencies include the United States Environmental Protection Agency (USEPA) and the Grand Portage Band of Chippewa/Ojibwe. Federal laws and policies, which the joint lead agencies are required to consider, will be outlined in the EIS for both mine permiting and land exchange processes.
Board on Coastal Engineering Research
In accordance with Section 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the following committee meeting: Name of Committee: Board on Coastal Engineering Research. Date of Meeting: October 25-26, 2010. Place: Atlanta Airport Marriott Gateway, 2020 Convention Center Concourse, Atlanta, GA 30337. Time: 3 p.m. to 6:15 p.m. (October 25, 2010). 8:30 a.m. to 3 p.m. (October 26, 2010).
Intent To Prepare an Environmental Impact Statement (EIS) for the San Juan Creek and Tributaries Flood Risk Management Study, Orange County, CA
The Los Angeles District of the U.S. Army Corps of Engineers will prepare an EIS to support the San Juan Creek, South Orange County, Feasibility Study. The purpose of this feasibility study is to evaluate flood risk management alternative measures along the lower portions of San Juan, Trabuco, and Oso Creeks. The San Juan Creek Watershed encompasses approximately 176 square miles of southern Orange County and western Riverside County in southern California. The Orange County Public Works Department is the local sponsor for this study. The study area extends along approximately 10.5 miles of San Juan Creek from the Pacific Ocean to the southern end of Ronald W. Casper's Wilderness Park, at the confluence of Bell Canyon Creek; Trabuco Creek from its confluence with San Juan Creek north approximately 9.5 miles to its confluence with Tijeras Creek; and Oso Creek from its confluence with Trabuco Creek northwest approximately 4.5 miles to just north of Oso Parkway. The communities of San Juan Capistrano, Mission Viejo, Laguna Hills, Laguna Niguel, Dana Point, Rancho Santa Margarita, Ladera Ranch, and Las Flores are located within the study boundary.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.