Engineers Corps October 15, 2010 – Federal Register Recent Federal Regulation Documents
Results 1 - 3 of 3
Notice of Availability of Final Environmental Impact Statement for the Sunridge Properties in the Sunridge Specific Plan Area, in Rancho Cordova, Sacramento County, CA, ID SPK-2009-00511
The U.S. Army Corps of Engineers, Sacramento District, (Corps) is issuing a Final Environmental Impact Statement (EIS) which analyzes programmatically the direct, indirect and cumulative effects associated with six residential development projects in the Sunridge Specific Plan area in Rancho Cordova, Sacramento County, CA. The purpose of the EIS is to provide decision-makers and the public with information pertaining to the Proposed Action and alternatives, and disclose environmental impacts and identify mitigation measures to reduce impacts. The Proposed Action is the construction of the six projects (collectively, the ``Sunridge Properties'') which would require the filling of approximately 29.7 acres of waters of the United States, including wetlands. The EIS has been prepared as part of ongoing litigation concerning Department of the Army (DA) permits issued by the Corps between 2005 and 2007 for five of the projects and a pending DA permit decision for the sixth. A stay in the litigation is in place for the Corps to complete the EIS. The EIS was prepared in accordance with the National Environmental Policy Act (NEPA) of 1969, as amended, and the Corps' regulations for NEPA implementation at 33 Code of Federal Regulations parts 230 and 325 Appendix B. The Corps is the lead Federal agency responsible for complying with NEPA and information contained in the EIS serves as the basis for decisions regarding issuance of a DA permit.
Chief of Engineers Environmental Advisory Board
In accordance with Section 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the following committee meeting: Name of Committee: Chief of Engineers Environmental Advisory Board (EAB). Topic: The EAB will discuss national considerations related to ecosystem restoration through integrated water resources management with emphasis on long-term recovery in the Gulf of Mexico, sea level rise in south Florida, and progress and status of South Florida ecosystem restoration. Date of Meeting: October 29, 2010. Place: The Westin Colonnade, 180 Aragon Avenue, Coral Gables, Florida 33134. Time: 9 a.m. to 12 p.m. Thirty minutes will be set aside for public comment. Members of the public who wish to speak are asked to register prior to the start of the meeting. Registration will begin at 8:30 a.m. Statements are limited to 3 minutes.
Intent To Prepare a Draft Environmental Impact Statement for the Louisiana Coastal Area-Plaquemines Parish, LA, Medium Diversion With Dedicated Dredging at Myrtle Grove Feasibility Study
The U.S. Army Corps of Engineers (USACE) intends to prepare a Draft Environmental Impact Statement (EIS) for the Louisiana Coastal Area (LCA)Louisiana, Medium Diversion at Myrtle Grove with Dedicated Dredging project. The proposed restoration feature consists of a diversion, coupled with dedicated dredging, that would allow the reintroduction of freshwater, sediment and nutrients into the critically effected area of the Barataria Basin, which is located in the Ascension, Assumption, Jefferson, Lafourche, Orleans, Plaquemines, St. Charles, St. James, and St. John the Baptist parishes, Louisiana. This particular combination of restoration features would allow for rapid creation of wetland acreage and enable long-term stability. This EIS will be tiered off of the programmatic EIS for the LCA Ecosystem Restoration Study, November 2004. The record of decision for the programmatic EIS was signed on November 18, 2005.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.