Engineers Corps March 2010 – Federal Register Recent Federal Regulation Documents
Results 1 - 7 of 7
Notice of Intent To Grant Exclusive License of U.S. Patent Application No. 12/432,842 Filed April 30, 2009 Entitled: “A Soil Stabilization Soil Comprising Same, and a Method of Stabilizing Soil”
In accordance with 37 CFR 404.7(a)(1)(i), announcement is made of a prospective exclusive license of the following U.S. Patent Application No. 12/432,842 Filed April 30, 2009.
United States Navy Restricted Area, Puget Sound, Naval Station Everett, Washington
The U.S. Army Corps of Engineers is proposing to amend its regulations for the restricted area established in the waters of Puget Sound adjacent to Naval Station Everett, Everett, Snohomish County, Washington. The amendments will enable the affected units of the United States military to enhance safety and security around an active military establishment. The regulations are necessary to safeguard military vessels and United States government facilities from sabotage and other subversive acts, accidents, or incidents of similar nature. The regulations are also necessary to protect the public from potentially hazardous conditions that may exist as a result of military use of the area.
Notice of Availability for Comments Regarding the Planned Environmental Assessment Interim Report IIIa Fish Deterrent Barriers, Illinois and Chicago Area Waterways
The U.S. Army Corps of Engineers, Chicago District is requesting public comments for a planned Environmental Assessment. The Corps is directed to conduct a study of technologies that may enhance the efficacy of the Chicago Sanitary and Ship Canal Dispersal Barriers System. The study is structured as a series of interim reports. Interim Report IIIa, limited to the impacts of implementing additional in- stream barrier/deterrent technologies at key locations in the Illinois and Chicago Area Waterways is the focus of this planned EA. The specific technologies under consideration include acoustic deterrents, air bubble curtains, and strobe lights used both individually and in combination. Comments are requested to assist in determining the level of analysis and impacts to be considered for implementing these in- stream barrier/deterrent technologies. Any comments received by the Corps on the proposed EA will be considered fully for the Federal action associated with the Project.
Inland Waterways Users Board
In Accordance with 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the forthcoming meeting.
Process for Requesting a Variance From Vegetation Standards for Levees and Floodwalls
In the February 9, 2010 issue of the Federal Register (75 FR 6364), the U.S. Army Corps of Engineers (Corps), published its proposed update to its current process for requesting a variance from vegetation standards for levees and floodwalls for public comment. In that notice, the Corps stated that written comments must be submitted on or before March 11, 2010. Instructions for submitting comments are provided in the February 9, 2010, Federal Register notice. In response to several requests, the Corps has decided to extend the public comment period to April 25, 2010.
Notice of Availability of a Final General Conformity Determination and Record of Decision for the Middle Harbor Redevelopment Project, Port of Long Beach, Los Angeles County, CA
In April 2009, the U.S. Army Corps of Engineers, Los Angeles District, Regulatory Division (Corps) in coordination with the Port of Long Beach (POLB) completed and published a joint Final Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the Middle Harbor Redevelopment Project (Project) in the POLB, including a Draft General Conformity Determination, for the Federal action associated with the Project. Comments were received on the Final EIS and Draft General Conformity Determination until May 3, 2009. A General Conformity Determination was required because Project construction would require Federal action (i.e., issuance of a Corps permit for work and structures in and over navigable waters and discharges of fill into waters of the U.S.) and not all the Federal action's direct and indirect air emissions would be below specified de minimis thresholds (40 CFR 93.153(b)). On February 23, 2010, the Corps completed its environmental review and made a Final General Conformity Determination, executed the Record of Decision (ROD), and issued a Standard Individual Permit for the Federal action associated with the Project, pursuant to Section 404 of the Clean Water Act and Section 10 of the River and Harbor Act. The Corps considered and responded to all comments received in making the Final General Conformity Determination, executing the ROD, and issuing the Corps permit. The public can request copies of the Final General Conformity Determination document or the
Intent To Prepare a Draft Environmental Impact Statement for the Everglades Restoration Transition Plan-Phase 1
The Jacksonville District, U.S. Army Corps of Engineers intends to prepare a Draft Environmental Impact Statement (EIS) for the Everglades Restoration Transition Plan (ERTP)Phase 1. The ERTP will supersede the 2006 IOP for the Cape Sable Seaside Sparrow which currently regulates operations for Central & South Florida (C&SF) project features in the south Dade area. The ERTP Phase 1 aims to implement operational flexibilities based on multi-species management. This project is ``phase 1'' in anticipation of subsequent operational modifications that will be needed to move towards Everglades restoration. Development of the plan will include evaluation of relevant new species information and hydrological data. The ERTP Draft EIS will evaluate the anticipated affects of implementation of operations to support the recommendations of the U. S. Fish and Wildlife Service (FWS) Biological Opinion.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.