Engineers Corps June 24, 2008 – Federal Register Recent Federal Regulation Documents

Spring Bayou, Louisiana, Ecosystem Restoration Feasibility Study
Document Number: E8-14240
Type: Notice
Date: 2008-06-24
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers, Vicksburg District, in conjunction with the Avoyelles Parish Police Jury, the non-Federal sponsor, is undertaking studies to investigate the feasibility of restoring the Spring Bayou area ecosystem.
Intent To Prepare a Draft Environmental Impact Statement for the Clear Creek General Reevaluation Study, Brazoria, Fort Bend, Galveston and Harris Counties, TX
Document Number: E8-14239
Type: Notice
Date: 2008-06-24
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The Clear Creek watershed drains portions of Fort Bend, Harris, Galveston, and Brazoria counties, Texas, including portions of Houston and the smaller towns of League City, Friendswood and Pearland, among others. The watershed also forms part of the boundary between Harris County to the north and Galveston and Brazoria counties to the south. Clear Creek flows into the west side of upper Galveston Bay through Clear Lake. The Draft Environmental Impact Statement (DEIS) will evaluate several flood detention and conveyance features to reduce flooding of homes and businesses in the Clear Creek Watershed. The study will focus on environmental and social conditions currently present and those likely to be affected by the proposed changes in the watershed. The flood-control project includes construction of several miles of high flow channel adjacent to the existing channel, while preserving the existing channel and floodplain forest. Detention of flood waters would also be provided in some areas where the high flow channel diverges from the low flow channel and in off-line detention areas adjacent to the creek. All flood control measures on Clear Creek occur upstream of the Dixie Farm Road crossing. The proposed project also includes widening three tributaries to Clear Creek, Mud Gully, Turkey Creek, and Mary's Creek, for improved conveyance of flood flows, with detention basins constructed adjacent to Mary's Creek and between Clear Creek and Mud Gully.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.