Army Department November 5, 2010 – Federal Register Recent Federal Regulation Documents
Results 1 - 2 of 2
Record of Decision (ROD) for Training Range and Garrison Support Facilities Construction and Operation at Fort Stewart, GA
The Department of the Army announces the availability of the ROD for the construction and operation of up to twelve range projects and two garrison support facilities at Fort Stewart. The Army, through the ROD, selects Alternative B for implementation. Alternative B includes sites for projects that predominantly utilize footprints of existing ranges, limits construction and restrictions on existing maneuver terrain, are located in relative close proximity to the cantonment area to reduce unit transit time, and have less overall environmental impacts. The decision sites ranges and support facilities in locations that reflect the proper balance of initiatives for the protection of the environment, mission needs, and Soldier and Family quality of life considerations.
Notice of Availability of a Draft Programmatic Environmental Impact Statement (PEIS) for the Growth, Realignment, and Stationing of Army Aviation Assets
The Department of the Army announces the availability of the Draft PEIS for the proposed growth, realignment, and stationing of new and existing Army aviation assets. The proposed action includes the consolidation and reorganization of existing aviation units, and the potential establishment of one or more Combat Aviation Brigades (CABs). The proposed action will increase the availability of helicopter assets to meet current and future national security requirements and will allow the Army better to organize existing aviation assets to promote more effective training and force management. The Draft PEIS evaluates the environmental impacts associated with the proposed action, which also includes the construction and renovation of garrison facilities, as well as additional training needed to support the aviation units. Land acquisition is not being considered as part of this action. The Draft PEIS considers the following alternatives: Alternative 1Realign and Station Existing Aviation Elements of Up to a Full CAB or Activate and Station a New CAB at Fort Carson, Colorado. Under this alternative, the Army either will consolidate existing aviation units not currently assigned to a CAB into a standard CAB structure at Fort Carson or activate a new CAB at Fort Carson. As part of this alternative, aviation units will conduct training on existing land at Pinon Canyon Maneuver Site (PCMS), Colorado, in order to maintain training proficiency and support integrated training with ground units. Land acquisition is not being considered as part of this action. Alternative 2Realign and Station Existing Aviation elements of Up to a Full CAB or Grow, Station and Activate a CAB at Joint Base Lewis- McChord (JBLM) Washington. Under this alternative, the Army either will consolidate existing aviation units not currently assigned to a CAB into a standard CAB structure at JBLM or activate a new CAB at JBLM. As part of this alternative, aviation units will conduct training on existing training land at Yakima Training Center (YTC), Washington, in order to maintain training proficiency and support integrated training with ground units. Land acquisition is not being considered as part of this action. Alternative 3Implement Alternatives 1 and 2 (preferred alternative). Under this alternative, the Army will implement both alternatives. Under this alternative, the consolidated units forming a CAB would be stationed at one installation, and the new CAB would be activated and stationed at the other installation. Fort Carson and JBLM would each gain up to one CAB. As part of this alternative, aviation units would conduct training on existing training land at the installation's training maneuver area (PCMS for Fort Carson and YTC for JBLM) in order to maintain training proficiency and support integrated training with ground units. Alternative 4No Action Alternative. Under this alternative, the Army would retain its aviation force structure at its current levels, configurations, and locations. Fort Carson and JBLM are the only stationing alternatives that meet all of the Army's stationing requirements for new CAB stationing. These locations have existing runways and airfields, provide adequate maneuver and airspace for CAB operations, and are equipped with existing training ranges that can support CAB training. Most importantly, Fort Carson and JBLM are the only major installations that have three or more Brigade Combat Teams but no CAB dedicated to provide aviation support for training. The proposed action would allow the Army to maximize integrated air-ground training. Land acquisition is not being considered as part of this action.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.