Army Department September 2010 – Federal Register Recent Federal Regulation Documents
Results 1 - 15 of 15
Intent To Grant an Exclusive Field of Use License of U.S. Government-Owned Patents
In accordance with 35 U.S.C. 209(e), and 37 CFR 404.7 (a)(1)(i) and 37 CFR 404.7 (b)(1)(i), announcement is made of the intent to grant a field of use exclusive, revocable license for the field of vaccination of ungulates to U.S. Patent No. 7,235,644 issued on June 26, 2007, U.S. Patent No. 7,025,963 issued on April 11, 2006, and U.S. Patent No. 7,018,636 issued on March 28, 2006, and related foreign patents and patent applications deriving from PCT/US95/04446, with all patents and patent applications entitled ``Vaccine Against Gram-Negative Bacterial Infections,'' to the University of Maryland, Baltimore, with its principal place of business at 620 West Lexington Street, 4th floor, Baltimore, Maryland 21201-1508.
Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1
The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it is releasing an interim change to the MFTURP No. 1 on October 1, 2010. The interim change updates Section B, Item 21, Detention: Vehicles With Power Units (DEP).
Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1
The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it is releasing an interim change to the MFTURP No. 1 on October 1, 2010. The interim change adds Item 180, Rail In-Transit Visibility (Rail ITV) Reporting, to Section C of the MFTURP No. 1.
Notice of Intent To Prepare an Environmental Impact Statement for Skokomish General Investigation Study, Mason County, WA
Pursuant to Section 102(2)(C) of the National Environmental Policy Act (NEPA) of 1969, as amended, the U.S. Army Corps of Engineers (USACE) will prepare an Integrated Feasibility Report/Environmental Impact Statement (FR/EIS) for proposed ecosystem restoration and flood risk management in the Skokomish River Basin which empties into Hood Canal, near Shelton, Washington. The Skokomish Indian Tribe and Mason County are the non-Federal sponsors for the project. The Skokomish River General Investigation (GI) Feasibility Study for the Skokomish River Basin is being conducted under the authority of Section 209 of the Flood Control Act of 1962 (Pub. L. 87-874). The Skokomish River channel has been filling with sediment for several decades, resulting in frequent flooding and decreasing natural ecosystem structures, functions, and processes necessary to support critical fish and wildlife habitat throughout the Skokomish River Basin. Increased sediment load, reduced flows, and encroachment of the floodplain by man-made structures are leading to continued degradation of natural ecosystem functions and habitat. The degraded riverine and estuarine aquatic habitat has caused a decline in the population of critical fish and wildlife species, including multiple ESA listed species. Additionally, the channel capacity of the Skokomish River varies significantly. Limited channel capacity causes floodwater to leave the banks at various locations, ultimately causing frequent flooding of local roads, two state highways, agricultural fields, residences, and other structures. The Skokomish River GI is a basin-wide study; however, work by others, constrain the limit of Corps' involvement to actions primarily in the lower Skokomish River Valley. Problems, opportunities, and objectives will be examined within the context of the entire watershed. Recognizing the relationships between the upper and lower watershed will ensure a comprehensive study overview. The purpose of the FR/EIS and feasibility study is to evaluate if there is a federal interest in aquatic ecosystem restoration and flood risk management in the Skokomish River Basin.
Intent To Prepare a Draft Environmental Impact Statement for the North Branch Ecorse Creek, Flood Risk Management General Reevaluation Study, Wayne County, MI
The U.S. Army Corps of Engineers (USACE), Detroit District, is issuing this Notice of Intent (NOI) to prepare a Draft Environmental Impact Statement (EIS) for flood risk management measures along the North Branch Ecorse Creek (NBEC) in Wayne County, MI. The Draft EIS is being prepared in conjunction with a General Reevaluation Report (GRR) of the NBEC to reevaluate the feasibility of providing flood risk management measures. The GRR/EIS is being completed in partnership with Wayne County, MI. The Draft EIS will address potential environmental impacts of the construction, operation, and maintenance of a number of structural and non-structural alternatives that will be evaluated as part of the GRR study.
Inland Waterways Users Board
In Accordance with 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the forthcoming meeting.
Intent To Prepare a Draft Programmatic Environmental Impact Statement (PEIS) for the Development of a Multi-Decadal Shoreline Protection Plan, Known as the Bogue Banks Beach Master Nourishment Plan (Master Plan), for the 25-Mile Ocean Shoreline of Bogue Banks in Carteret County, NC
The U.S. Army Corps of Engineers (USACE), Wilmington District, Wilmington Regulatory Field Office has received a request for Department of the Army authorization, pursuant to Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbor Act, from Carteret County to develop and implement, under an inter-local agreement between the towns on Bogue Banks barrier island, a multi- decadal Master Plan that would provide ocean shoreline protection to approximately 25 miles of beach over a minimum period of 30 years.
Intent To Grant Field of Use Exclusive License to U.S. Government-Owned Patents
In accordance with 35 U.S.C. 209(e), and 37 CFR 404.7 (a)(1)(i) and 404.7(b)(1)(i), announcement is made of the intent to grant a field of use exclusive, revocable license for the field of prevention and/or therapeutic treatment of vaccinia virus infections or other orthopoxvirus infections to the inventions claimed in U.S. Patent No. 6,451,309 entitled ``Prophylactic and Therapeutic Monoclonal Antibodies,'' issued September 17, 2002, and U.S. Patent No. 6,620,412 entitled ``Prophylactic and Therapeutic Monoclonal Antibodies,'' issued September 16, 2003, which is a continuation of U.S. Patent No. 6,451,309, and related foreign patents and patent applications (PCT/ US2001/04520) to Biofactura, Inc., with its principal place of business at 9430 Key West Avenue, Suite 125, Rockville, MD 20850-6345.
Record of Decision (ROD) for Conversion of the 3rd Armored Cavalry Regiment (3rd ACR) to a Stryker Brigade Combat Team (SBCT) at Fort Hood, TX
The Department of the Army announces a ROD for conversion of the 3rd ACR to an SBCT at Fort Hood and discusses the environmental impacts of this decision. After conversion, the 3rd ACR will provide the Army with a force structure that has the flexibility to respond better to threats in an unpredictable global security environment. The Army's strategic estimate remains that its force requirements will best be met by a robust multiweight force, composed of a mix of Infantry BCTs and Heavy Armor BCTs augmented with the protection and versatility of an additional SBCT. The 3rd ACR at Fort Hood is being selected because the unit will have maximum time to convert and train with new equipment prior to redeploying. In addition, Fort Hood is an installation capable of providing fully modernized training infrastructure, as well as many of the existing garrison support facilities required for an SBCT, and has adequate maneuver space to accommodate SBCT training. The 3rd ACR will begin converting in 2012 and will be complete in Fiscal Year 2014. With this conversion, the Army will have nine SBCTs (eight Active Component and one Reserve Component).
Final Environmental Impact Statement (FEIS) for Grow the Army Actions at Fort Lewis and the Yakima Training Center (YTC), WA
The Department of the Army announces the availability of an FEIS for Fort Lewis and YTC that analyzes the environmental impacts of implementing the decisions in the 2007 Army Growth and Force Structure Realignment Programmatic EIS (also referred to as the Grow The Army PEIS or GTA PEIS) and other ongoing Army realignment and stationing initiatives, such as the potential for Combat Aviation Brigade (CAB) stationing that may potentially effect Fort Lewis and YTC. The Proposed Action could station up to 5,700 Soldiers and their Families at Fort Lewis. The Proposed Action includes the stationing of 1,900 Soldiers directed under the GTA PEIS, the potential additional stationing of up to 1,000 combat service support (CSS) Soldiers, and the potential stationing of a medium Combat Aviation Brigade (CAB) of approximately 2,800 Soldiers for a total of up to 5,700 Soldiers. After reviewing the alternatives analyzed in the FEIS, the Army has identified Alternative 4 as its preferred alternative, which includes all components of the GTA, CSS, and CAB alternatives (up to a total of 5,700 Soldiers and 8,260 family members).
Preparation of a Programmatic Environmental Impact Statement (PEIS) for the Growth, Realignment, and Stationing of Army Aviation Assets
The Army announces its intent to prepare a PEIS for the proposed growth, realignment, and stationing of new and existing Army aviation assets. The proposed action includes the consolidation and reorganization of existing aviation units, and the establishment of one or more Combat Aviation Brigades (CABs). The proposed action will increase the availability of rotary wing assets to meet current and future national security requirements and will allow the Army better to organize existing aviation assets to promote more effective training and force management. The PEIS will evaluate the environmental impacts associated with the proposed action, which includes the construction and renovation of garrison facilities and additional training needed to support the establishment and realignment of aviation units. The Army is considering the following alternatives in the PEIS: (1) Realign and consolidate existing aviation elements of up to a full CAB at Fort Carson (CO) or Joint Base Lewis-McChord (WA); (2) implement those actions discussed in Alternative 1; in addition, establish a new CAB and station it at Fort Carson or Joint Base Lewis-McChord; and, (3) No-Action Alternative that would retain the Army aviation force structure at its current levels, configurations, and locations. No more than one additional CAB would be assigned to either of the stationing locations being considered. As part of Alternatives 1 and 2, aviation units would conduct training on existing training land at either the Yakima Training Center (YTC) (WA) or the Pinon Canyon Maneuver Site (PCMS) (CO) in order to maintain training proficiency and support integrated training with ground units. Land acquisition is not being considered as part of this action. Fort Carson and Joint Base Lewis-McChord are the only stationing alternatives that meet all of the Army's stationing requirements for new CAB stationing. These locations provide an existing runway and airfield, provide adequate maneuver and airspace for CAB operations, and are equipped with existing training ranges that can support CAB training. Each location is currently the home station of three or more ground maneuver Brigade Combat Teams (BCTs), which allows the Army to maximize integrated air/ground training. Joint Base Lewis-McChord and Fort Carson are the only major installations that have three or more BCTs but no CAB dedicated to provide aviation support for training. Additionally, Joint Base Lewis-McChord has many of the existing garrison facilities to accommodate CAB units while Fort Carson has space available to construct additional CAB facilities.
Intent To Grant an Exclusive Field of Use License of a U.S. Government-Owned Patent Application
In accordance with 35 U.S.C. 209(e), and 37 CFR 404.7 (a)(1)(i), announcement is made of the intent to grant an exclusive, revocable license for the field of use in the research reagent market to the invention described in U.S. Patent Application No. 61/252,675 entitled ``Enhanced Substrates for The Protease Activity of Serotype A Botulinum Neurotoxin,'' filed October 18, 2009, to List Biological Laboratories, with its principal place of business at 540 Division Street, Campbell, California 95008-6906.
Notice of Intent To Grant Partially Exclusive License of the United States Patent Application No. 12/243,084, Filed October 01, 2008, Entitled: Soluble Salt Produced From a Biopolymer and a Process for Producing the Salt
In accordance with 37 CFR 404.7(a)(1)(i), announcement is made of a prospective partially exclusive license of the following U.S. Patent Application 12/243,084, Filed October 01, 2008, to Green & Grow LLC for use in agricultural applications and products (to include crop preparation, cover crop, seed germination, seed coatings, side dressing, lawn application and starter ground cover) and applications in the fields of soil and slope stabilization, enhanced bioremediation, dust and run-off control, fly ash removal, emissions particulate removal, metal and inorganic chelation in soils and water, soil erosion, road stabilizer, and dust suppression.
Notice of Intent To Grant Partially Exclusive License of the United States Patent Application No. 12/243,084, Filed October 01, 2008 Entitled: Soluble Salt Produced From a Biopolymer and a Process for Producing the Salt
In accordance with 37 CFR 404.7(a)(1)(i), announcement is made of a prospective partially exclusive license of the following U.S. Patent Application 12/243,084 Filed October 01, 2008 to SecureNet LLC for use of the biopolymer for change detection and security applications.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.