Army Department November 10, 2005 – Federal Register Recent Federal Regulation Documents

Upper Columbia Alternative Flood Control and Fish Operations, Libby and Hungry Horse Dams, MT
Document Number: 05-22406
Type: Notice
Date: 2005-11-10
Agency: Department of Defense, Department of the Interior, Department of the Army, Corps of Engineers, Bureau of Reclamation, Engineers Corps, Army Department
In accordance with the requirements of the National Environmental Policy Act, the U.S. Army Corps of Engineers (USACE), Seattle District, and the Bureau of Reclamation (Reclamation), Pacific Northwest Region, have prepared a Draft Environmental Impact Statement (DEIS) to evaluate the effects of alternative flood control at Libby Dam on the Kootenai River and at Hungry Horse Dam on the South Fork Flathead River in western Montana. USACE and Reclamation are making the document available to the public for review and comment through a Notice of Availability published in the Federal Register. The overall goal of the DEIS is to evaluate effects of alternative dam operations that are intended to provide reservoir and flow conditions at and below Libby and Hungry Horse Dams for anadromous and resident fish listed as threatened or endangered under the Endangered Species Act (ESA), consistent with authorized project purposes, including maintaining the current level of flood control benefits.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.