Agricultural Marketing Service August 28, 2015 – Federal Register Recent Federal Regulation Documents
Results 1 - 4 of 4
Collection of Information Under Review by Office of Management and Budget
In compliance with the Paperwork Reduction Act of 1995, the U.S. Coast Guard is forwarding the Information Collection Requests (ICRs), abstracted below, to the Office of Management and Budget (OMB), Office of Information and Regulatory Affairs (OIRA), requesting approval of a reinstatement, without change, of a previously approved collection for which approval has expired: 1625-0006, Shipping Articles and 1625-0018, Official Logbook. Review and comments by OIRA ensure we only impose paperwork burdens commensurate with our performance of duties.
Safety Zone; Upper Mississippi River MM 180.0 to 180.5; St. Louis, MO
The Coast Guard is establishing a temporary safety zone for all waters of the Upper Mississippi River, surface to bottom, between mile 180.0 and 180.5. This temporary safety zone is necessary to protect persons and property from potential damage and safety hazards during Lumiere Place Fireworks displays. During the periods of enforcement, no vessels may be located within the Coast Guard safety zone. Entry into this Coast Guard safety zone is prohibited unless specifically authorized by the Captain of the Port (COTP) Upper Mississippi River or other designated representative.
Drawbridge Operation Regulation; Housatonic River, Stratford, CT
The Coast Guard has issued a temporary deviation from the operating schedule that governs the Devon Bridge, across the Housatonic River, mile 3.9, at Stratford, CT. This deviation is necessary to perform superstructure repairs and timber ties replacement. This deviation allows the bridge to remain in the closed position for 50 days.
Drawbridge Operation Regulation; Newark Bay, Newark, NJ
The Coast Guard has issued a temporary deviation from the operating schedule that governs the Lehigh Valley Drawbridge, across Newark Bay, mile 4.3, at Newark, New Jersey. This deviation is necessary to replace bridge timbers and miter rails. This deviation allows the bridge to remain in the closed position for 10 hours for two days.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.