Nuclear Regulatory Commission April 25, 2024 – Federal Register Recent Federal Regulation Documents
Results 1 - 2 of 2
Regulatory Guide: Installation, Inspection, and Testing for Class 1E Power, Instrumentation, and Control Equipment at Production and Utilization Facilities
The U.S. Nuclear Regulatory Commission (NRC) is issuing Revision 1 to Regulatory Guide (RG) 1.30, "Installation, Inspection, and Testing for Class 1E Power, Instrumentation, and Control Equipment at Production and Utilization Facilities." This RG describes an approach that is acceptable to the NRC staff to meet the regulatory requirements for installation, inspection, and testing for Class 1E power, instrumentation, and control equipment at production and utilization facilities.
Regulatory Guide: Installation Design and Installation of Vented Lead-Acid Storage Batteries for Production and Utilization Facilities
The U.S. Nuclear Regulatory Commission (NRC) is issuing Revision 3 to Regulatory Guide (RG) 1.128, "Installation Design and Installation of Vented Lead-Acid Storage Batteries for Production and Utilization Facilities." This RG describes an approach that is acceptable to the NRC staff to meet regulatory requirements for the installation design and installation of vented lead-acid storage batteries in production and utilization facilities.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.