Regulatory Guide: General Site Suitability for Nuclear Power Stations
The U.S. Nuclear Regulatory Commission (NRC) is issuing Revision 4 to Regulatory Guide (RG), 4.7, ``General Site Suitability for Nuclear Power Stations.'' Revision 4 to RG 4.7 describes the major site characteristics related to public health and safety and environmental issues that the NRC staff considers in determining the suitability of sites for commercial nuclear power stations.
Draft Regulatory Guide: Preparing Probabilistic Fracture Mechanics Submittals
The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment a draft Regulatory Guide (DG), DG-1422, ``Preparing Probabilistic Fracture Mechanics Submittals.'' This DG is proposed Revision 1 to Regulatory Guide (RG) 1.245, ``Preparing Probabilistic Fracture Mechanics Submittals.'' DG-1422 describes an approach that is acceptable to the staff of the NRC for performing probabilistic fracture mechanics (PFM) analyses in support of regulatory applications.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.